Atatürk Dam

Atatürk Dam

Atatürk Dam
Location of Atatürk Dam in Turkey
Official name Atatürk Dam
Location Şanlıurfa, Turkey
Coordinates 37°28′54″N 38°19′03″E / 37.48167°N 38.31750°E / 37.48167; 38.31750Coordinates: 37°28′54″N 38°19′03″E / 37.48167°N 38.31750°E / 37.48167; 38.31750
Construction began 1983
Opening date 1992
Operator(s) State Hydraulic Works (DSİ)
Dam and spillways
Impounds Euphrates
Height 169 m (554 ft)
Length 1,819 m (5,968 ft)
Reservoir
Creates Lake Atatürk
Total capacity 48,700,000,000 m3 (39,500,000 acre·ft)
Surface area 817 km2 (315 sq mi)
Power station
Turbines 8 x 300 MW Francis-type
Installed capacity 2,400 MW
Annual generation 8,900 gigawatt-hours (32,000 TJ)

The Atatürk Dam (Turkish: Atatürk Barajı), originally the Karababa Dam, is a zoned rock-fill dam with a central core[1] on the Euphrates River on the border of Adıyaman Province and Şanlıurfa Province in the Southeastern Anatolia Region of Turkey. Built both to generate electricity and to irrigate the plains in the region, it was renamed in honour of Mustafa Kemal Atatürk (1881–1938), the founder of the Turkish Republic. The construction began in 1983 and was completed in 1990. The dam and the hydroelectric power plant, which went into service after the upfilling of the reservoir was completed in 1992, are operated by the State Hydraulic Works (DSİ). The reservoir created behind the dam, called Lake Atatürk Dam (Turkish: Atatürk Baraj Gölü), is the third largest in Turkey.

The dam is situated 23 km (14 mi) northwest of Bozova, Şanlıurfa Province, on state road D-875 from Bozova to Adıyaman. Centerpiece of the 22 dams on the Euphrates and the Tigris, which comprise the integrated, multi-sector, Southeastern Anatolia Project (Turkish: Güney Doğu Anadolu Projesi, known as GAP), it is one of the world's largest dams. The Atatürk Dam, one of the five operational dams on the Euphrates as of 2008, was preceded by Keban and Karakaya dams upstream and followed by Birecik and the Karkamış dams downstream. Two more dams on the river have been under construction.

The dam embankment is 169 m high (554 ft) and 1,820 m long (5,970 ft). The hydroelectric power plant (HEPP) has a total installed power capacity of 2,400 MW and generates 8,900 GW·h electricity annually.[2] The total cost of the dam project was about US$1,250,000,000.[3]

The dam was depicted on the reverse of the Turkish one-million-lira banknotes of 1995–2005[4] and of the 1 new lira banknote of 2005–2009.[5]

Dam

The initial development project for the southeastern region of Turkey was presented in 1970. As the objectives for regional development have changed significantly and the ambitions have grown in the 1970s, the original plan underwent major modifications. The most important change in the project was abandoning the Middle Karababa Dam design, and adopting the design of the Atatürk Dam to increase the storage and power generation capacities of the dam.[6]

Dolsar Engineering and ATA Construction, two prominent Turkish companies, signed for the building of the dam.[7] The construction of the cofferdam began in 1985 and was completed in 1987. The fill work for the main dam lasted from 1987 to 1990.[1] The Atatürk Dam, listed in international construction publications as the world's largest construction site, was completed in a world record time of around 50 months.[3]

The rock-fill dam undergoes deformations that are regularly and systematically monitored since 1990 with different types of sensors. It is estimated that the central portion of the dam crest has settled by around 7 m (23 ft) since the end of the construction. Settlement of the dam crest up to 4.3 m (14 ft) has been measured since the start of the detailed geodetic monitoring in 1992. The maximum horizontal (radial) deformation measured is about 2.9 m (9.5 ft).[1]

The permeation grouting work[8] was carried out by subcontractor Solétanche Bachy and the rehabilitation work for the post-tensioning of the dam crest with ground anchors by Vorspann System Losinger International (VSL).[9]

Hydroelectric power plant

The HEPP of the Atatürk Dam is the biggest of a series of 19 power plants of the GAP project. It consists of eight Francis turbine and generator groups of 300 MW each, supplied by Sulzer Escher Wyss and ABB Asea Brown Boveri respectively. The up to 7,25 m dia steel pressure pipes (penstocks) with a total weight of 26.600 tons were supplied and installed by the German NOELL company (today DSD NOELL).[7] The power plant's first two power units came on line in 1992[10] and it became fully operational in December 1993. The HEPP can generate 8,900 GWh of electricity annually.[11] Its capacity makes up around one third of the total capacity of the GAP project.[12]

During the periods of low demand for electricity, only one of the eight units of the HEPP is in operation while in times of high demand, all the eight units are in operation. Hence, depending upon the energy demand and the state of the interconnected system, the amount of water to be released from the HEPP might vary between 200 and 2,000 m3/s in one day.[12]

Irrigation

Originating in the mountains of eastern Anatolia and flowing southwards to Syria and Iraq, the Euphrates and the Tigris are very irregular rivers, used to cause great problems each year with droughts in summer and flooding in winter. The water of the Euphrates River is regulated by means of large reservoirs of the Keban and Atatürk Dams. However, the waters released from the HEPPs of those dams also need to be regulated. The Birecik and the Karkamış Dams downstream the Atatürk Dam are constructed for the purpose of harnessing the waters released from large-scale dams and HEPPs.

Nearly 4,760 km2 (1,840 sq mi) of arable land in the Şanlıurfa-Harran and Mardin-Ceylanpınar plains in upper Mesopotamia is being irrigated via gravity-flow with water diverted from the Atatürk Dam through the Şanlıurfa Tunnels system,[13] which consists of two parallel tunnels, each 26.4 km (16.4 mi) long and 7.62 m (25.0 ft) in diameter.[11][12] The flow rate of water through the tunnels is about 328 m3/s (11,600 cu ft/s), which makes one-third of the total flow of the Euphrates.[14] The tunnels are the largest in the world, in terms of length and flow rate, built for irrigation purposes. The first tunnel was completed in 1995 and the other in 1996. The reservoir behind the dam will irrigate another 406,000 ha by pumping for a total of 882,000 ha.[15]

The Atatürk Dam and the Şanlıurfa Tunnel system are two major components of the GAP project. Irrigation started in the Harran Plain in the spring of 1995. The impact of the irrigation on the economy of the region is significant. In ninety percent of the irrigated area, cotton is planted. Irrigation expansion within the Harran plains also increased Southeastern Anatolia's cotton production from 164,000 to 400,000 metric tons in 2001, or nearly sixty percent. With almost 50% share of the country's cotton production, the region developed to the leader in Turkey.[13]

Reservoir lake

Reverse of the 1 million Turkish lira banknote, depicting the Atatürk Dam (1995–2005).

The reservoir Lake Atatürk Dam, extending over an area of 817 km2 (315 sq mi) with a water volume of 48.7 km3 (63,400 million cu yd), ranks third in size in Turkey after Lake Van and Lake Tuz. The reservoir water level touched 535 m (1,755 ft) amsl in 1994. Since then, it varies between 526 and 537 m amsl. The full reservoir level is 542 m (1,778 ft), and the minimum operation level is 526 m (1,726 ft) amsl.[1]

Some 10 towns and 156 villages of three provinces are located around the Lake Atatürk Dam. The lake provides a fisheries and recreation site. For transportation purposes, several ferries have been operated in the reservoir.[16] The reservoir lake is called "sea" by local people.[17]

Fishery

Atatürk Dam Lake is an abundant source of food for local people and also provides opportunities for recreational fishing. In 1992, around 200,000 young fish (fingerlings), propagated in DSI's Atatürk Fish Hatchery, were introduced into the reservoir. Since then, the figure of fingerlings stocked into the lake reached around 33 million.[18]

Commercially fishing in the reservoir developed to a catch of around annually 1,000 tons of some fish species with a market value of US$1.26 million.[18] 8 of the 12 fish species being caught are economically valuable.[16] In addition, the lake has a potential for cage culture of 7,000 tons/year worth of US$14 million.[18]

With the aim of utilizing the fishing potential and creating jobs for the lakeside populations, the reservoir is zoned to 21 fishing sectors, each one having a water products cooperative.[19] Considering all aspects of fishery activities, the reservoir contributes in total US$15 million to GNP and generates employment for 1,600 people.[18]

Recreation and sports

In order to open the region to tourism, to introduce modern sports to the local people and to integrate the social and economic progress taking place in the region with sports as a drive, a water sports festival was established in 1994, which takes place each year in September. The young people in the region developed an interest in water sports and started to take part in international contests in the branches of sailing, rowing-canoeing, swimming and diving on the Lake Atatürk Dam.[20]

Furthermore, International Atatürk Dam Sailing Competition takes place every year in October on the lake.[21]

Resettlement and salvaging cultural heritage

With the forming of the reservoir lake, more than a hundred hamlets and villages were inundated and about 55,000 people were forced to relocate, many of them resettling in nearby communities.[22] According to other sources, the construction of the dam resulted in involuntary resettlement of between 45,000 and 53,500 people.[23]

In 1989, the old town of Samosata (Samsat), capital of the ancient Commagene kingdom located in Adıyaman Province was flooded behind the Atatürk Dam. A new town with the same name Samsat was founded for the around 2,000 people dislocated.

The birthplace of the Ancient Greek poet Lucian was lost when the dam was created.

Since the entire GAP area was home to early civilizations of Hittites, Assyrians, Medes, Persians, Greeks, Romans, Arabs and Turks, and therefore rich in terms of historical remains, cultural heritage of the region was a concern. The subject of salvaging cultural heritages gained importance, particularly after inundation of Samsat.[24]

The early Neolithic settlement of Nevalı Çori, site of some of the world's most ancient known temples and monumental sculpture, was discovered during rescue excavations before the dam was completed. Nevalı Çori was inundated by Atatürk Dam's reservoir.

Political controversy

About 90% of Euphrates' total annual flow originates in Turkey, while the remaining part is added in Syria, but nothing is contributed further downstream in Iraq. In general, the stream varies greatly in its flow from season to season and year to year. As an example, the annual flow at the border with Syria ranged from 15.3 km3 (3.7 cu mi) in 1961 to 42.7 km3 (10.2 cu mi) in 1963.

One of the most important legal texts on the waters of the Euphrates-Tigris river system is the protocol annexed to the 1946 Treaty of Friendship and Good Neighborly Relations between Iraq and Turkey. The protocol provided the control and management of the Euphrates and the Tigris depending to a large extent on the regulations of flow in Turkish source areas. Turkey agreed to begin monitoring the two border-crossing rivers and to share related data with Iraq. In 1980, Turkey and Iraq further specified the nature of the earlier protocol by forming a joint committee on technical issues, which Syria joined later in 1982 as well. Turkey unilaterally guaranteed to allow 15.75 km3/year (500 m3/s) of water across the border to Syria without any formal agreement on the sharing of the Euphrates water.[14]

Mid-January 1990, when the first phase of the dam was completed, Turkey held back the flow of the Euphrates entirely for a month to begin filling up the reservoir. Turkey had notified Syria and Iraq by November 1989 of her decision to fill the reservoir over a period of one month explaining the technical reasons and providing a detailed program for making up for the losses.[25] The downstream neighbors protested vehemently. At this point, the Atatürk Dam has cut the flow from the Euphrates by about a third.[26]

Syria and Iraq claim to be suffering severe water shortages due to the GAP development. Both countries allege that Turkey is intentionally withholding supplies from its downstream neighbors, turning water into a weapon. Turkey denies these claims, and insists it has always supplied its southern neighbors with the promised minimum of 500 m3/s (18,000 cu ft/s). It argues that Iraq and Syria in fact benefit from the regulated water by the dams as they protect all three riparian countries from seasonal droughts and floods.[27]

See also

References

  1. 1 2 3 4 S. Malla; M. Wieland; R. Straubhaar (2006-10-17). "Monitoring Atatürk Dam". International Water Power & Dam Construction. Retrieved 2008-02-02.
  2. "Atatürk Dam". State Hydraulic Works. 2008. Retrieved 2008-02-02.
  3. 1 2 "ATA Group". Archived from the original on 19 December 2007. Retrieved 2008-02-02.
  4. Central Bank of the Republic of Turkey Archived 2009-06-03 at WebCite. Banknote Museum: 7. Emission Group - One Million Turkish Lira - I. Series, II. Series & III. Series. – Retrieved on 20 April 2009.
  5. Central Bank of the Republic of Turkey Archived 2009-06-03 at WebCite. Banknote Museum: 8. Emission Group - One New Turkish Lira - I. Series.
    Announcement on the Withdrawal of E8 New Turkish Lira Banknotes from Circulation Archived April 22, 2009, at the Wayback Machine., 8 May 2007. – Retrieved on 20 April 2009.
  6. Brismar, Anna (2002). "The Atatürk Dam project in south-east Turkey: Changes in objectives and planning over time" (abstract). Natural Resources Forum. 26 (2) (2): 101–112. doi:10.1111/1477-8947.00011. Retrieved 2008-02-02.
  7. 1 2 "Hydroelectric Power Plants in Southern Turkey". Archived from the original on 2008-01-11. Retrieved 2008-02-02.
  8. "Solétanche Bachy".
  9. "Structurae International Database and Gallery of Structures". Retrieved 2008-02-02.
  10. Chapin Metz, Helen, ed. (1995). "Turkey: A Country Study". Washington: GPO for the Library of Congress. Retrieved 2008-02-02.
  11. 1 2 "Tourism net". Retrieved 2008-02-02.
  12. 1 2 3 "The Tigris & Euphrates Basin". Vital Facts:Water Resources and Middle East. Retrieved 2008-02-02.
  13. 1 2 "Southeastern Anatolia Becomes a Major Cotton Producing Region for Turkey". U.S. Dept of Agriculture - Foreign Agricultural Service. 2001-08-28. Retrieved 2008-02-03.
  14. 1 2 "Turkey". AQUASTAT - Food and Agriculture Organization of the United Nations. Archived from the original on 27 February 2008. Retrieved 2008-02-02.
  15. "Turkey - GAP's Irrigation Component". U.S. Dept of Agriculture - Foreign Agricultural Service. Archived from the original on 2008-10-13. Retrieved 2008-02-03.
  16. 1 2 Duman, Erdal; Ahmet Çelik (2001). "Fishes Caught in Bozova Region of Atatürk Dam Lake and Their Production" (PDF). E.U. Journal of Fisheries & Aquatic Sciences. Ege University Press. 18 (1–2): 65–69. Retrieved 2008-02-04.
  17. "Adıyamanlı". Archived from the original on 26 January 2008. Retrieved 2008-02-03.
  18. 1 2 3 4 "IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits. Case Study 12-03: Benefits due to Dam Function - Atatürk Dam and Hydroelectric Power Plant, Turkey" (PDF). Retrieved 2008-02-04.
  19. "Raising the Income Level of People in Areas out of the Coverage Irrigation in the GAP Region". GAP. Retrieved 2008-02-04.
  20. "Atatürk Dam Becomes the Stage for the 5th Water Sports Festival". 1999-09-20. Retrieved 2008-02-02.
  21. Guide Martine
  22. MacQuarrie, Patrick (2004-02-26) [revised]. "Water Security In The Middle East Growing Conflict Over Development In The Euphrates - Tigris Basin". The New York Times. Retrieved 2008-02-02.
  23. Bogumil Terminski (2015). Development-Induced Displacement and Resettlement: Causes, Consequences, and Socio-Lagal Context. Ibidem Press, p. 153.
  24. "IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits. Case Study 10-03: Landscape and Cultural Heritage - Border Euphrates Project, Turkey" (PDF). Retrieved 2008-02-02.
  25. Kibaroğlu, Ayşegül. "An Institutional Framework for Facilitating Cooperation in the Euphrates-Tigris River Basin" (PDF). Department of International Relations, Middle East Technical University, Ankara, Turkey. Retrieved 2008-02-08.
  26. "Water May Be Next Flashpoint In Mideast". Senate. 1992-03-26. Retrieved 2008-02-02.
  27. De Châtel, Francesca (2003-01-14). "Turkish Water Project: Curse or Blessing?". Islam Online. Retrieved 2008-02-03.