South African Class 21E

South African Class 21E

No. 21-010 at Koedoespoort, 29 September 2015
Type and origin
Power type Electric
Designer Zhuzhou Electric Locomotive Co.
Builder Zhuzhou Electric Locomotive Co.
Transnet Engineering
Model ZELC 21E
Build date 2014-2015
Total produced 100
Specifications
AAR wheel arr. B-B
UIC class Bo'Bo'
Gauge 3 ft 6 in (1,067 mm) Cape gauge
Axle load 26,000 kg (57,000 lb)
Power supply Catenary
Current collection Pantographs
Traction motors Four
MU working 8 units
Loco brake Electro-pneumatic, regenerative & rheostatic
Train brakes Air
Couplers AAR knuckle
Performance figures
Maximum speed 100 km/h (62 mph)
Power output 3,000 kW (4,000 hp)
Career
Operators Transnet Freight Rail
Class 21E
Power class Dual 3 kV DC & 25 kV AC/50Hz
Number in class 100
Numbers 21-001 to 21-100
Delivered 2014-2015
First run 2014

The Transnet Freight Rail Class 21E of 2014 is a South African electric locomotive.

On 16 September 2014, the first of the Class 21E dual voltage electric locomotives for Transnet Freight Rail was rolled out at the CSR Zhuzhou Electric Locomotive Company in China. Two of these locomotives were built in China with another 38 to follow, while the rest were built locally.[1][2][3]

Manufacturer

The first forty of the one hundred 3 kV DC and 25 kV AC dual voltage Class 21E electric locomotives for Transnet Freight Rail were built in China by Zhuzhou Electric Locomotive Company, a subsidiary of the China South Locomotive and Rolling Stock Corporation (CSR), China's leading train manufacturer.[1]

The roll-out ceremony of the first locomotive, no. 21-001, took place at the factory on 16 September 2014. The remaining sixty locomotives of the order were built in South Africa.[2][3][4]

According to the project plan, the agreement also included the joint production of more electric locomotives, electric multiple units, suburban rail vehicles and rail transportation equipment for South Africa and the African region.[1][2][3][4]

The first two locomotives were delivered for acceptance trials on 11 December 2014. They came ashore at Maydon Wharf in Durban and were moved dead in tow to Pyramid South Depot, north of Pretoria, the following day. No. 21-002 was equipped with load-measuring-wheelsets, painted yellow, on its front bogie.

Characteristics

The Class 21E is virtually identical in visual appearance to the earlier Class 20E locomotive, which was described by the manufacturer as the "promotion version" of the Class 21E. It is, in essence, an upgraded version of the Class 20E, based on customer requirements. It is a heavier locomotive, with the axle load increased to 26,000 kilograms (57,000 pounds) and with improved tractive effort, to make it more suitable for service on the Coalink line. It makes use of more advanced electronically controlled pneumatic (ECP) brake system technology to control the train's air brakes through electrical signals, which improves the train's braking response time and results in improved safety and reliability. The four-axle locomotive is capable of an output of 3,000 kilowatts (4,000 horsepower) and a speed of 100 kilometres per hour (62 miles per hour). Its microcomputer network control system allows eight of these locomotives to work together in a multi-unit consist, and also to work consisted to diesel-electric locomotives.[1][2][3]

The only externally visible differences between the Classes 20E and 21E are on the end sills, buffer beams, cowcatchers and the left side of the cab roof.

Layout

The locomotive body is a welded monocoque design, constructed of steel plates and profiled members, which has a compressive strength of 4.45 meganewtons (1,000,000 pounds-force) and a tensile strength of 4 meganewtons (900,000 pounds-force). The Class 21E has a single cab and a gangway along the centre of the locomotive. It is equipped with a wireless data transmission system which can send the locomotive operation status, fault data and energy consumption data via GSM and Wi-Fi to a trackside station for analysis. It is also equipped with an axle temperature alarm device, fire alarm system, closed-circuit television (CCTV) system, wheel flange lubricating device and, as personnel safety measure, high voltage protective interlocking devices. The AC traction motors are powered through insulated-gate bipolar transistor (IGBT) control.[6]

Dual voltage

As on the dual voltage Classes 19E and 20E, the main electric circuit is automatically selected in either AC or DC mode, based on the voltage of the overhead contact wire feeding the locomotive. To facilitate automatic trouble-free transition on the run, the locomotive is equipped with onboard voltage detectors, while the overhead wire is equipped with two wooden isolators and a 3 metres (10 feet) length of neutral wire, to separate the AC and DC feeds. The neutral section is connected to the rails, which serve as the return conductor on electrified lines.[6]

The transition process requires that the locomotive should automatically be switched off before it reaches the isolators and the unpowered overhead wire section, and automatically be restarted after exiting from under the unpowered wire. This is done by a pair of track magnets, one on either side of the neutral overhead wire and spaced 45 metres (148 feet) apart. The two magnets are mounted with their polarities reversed in relation to each other and they activate a magnetic relay, located behind the cowcatcher of the locomotive, to do the switching off and restarting.[6]

Pantographs

Transnet Freight Rail insisted that the locomotive must be designed in such a way that the pantograph contact shoe centres are directly above the bogie pivot centres, as was done on the Class 7E and Class 7E2, Series 1 and Series 2 and again on the Class 20E. The reason is to reduce the possibility of pantograph hookups on catenary in sharp curves, such as in turnouts, as a result of sideways movement of the pantograph in relation to the overhead wire.[6][7]

Service

The Class 21E was placed in service on the 25 kV AC Coalink line between Ermelo and the Richards Bay Coal Terminal.[2][3] They work directly from the coal mines around Ermelo, running under 3 kV DC catenary. The dual voltage Class 21E locomotives can therefore haul their loads directly from the mines all the way to Richards Bay, without having to change locomotives in Ermelo to cater for the change in the power supply.

Illustration

The pictures serve to illustrate the Class 21E from all sides.

References

Wikimedia Commons has media related to South African Class 21E.
This article is issued from Wikipedia - version of the 2/28/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.