Line 11, Beijing Subway

Line 11, Beijing Subway
Overview
Type Rapid transit
System Beijing Subway
Status Planned
Termini Dougezhuang
Jindingjie
Operation
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd
Technical
Track gauge 1,435 mm (4 ft 8 12 in)

Line 11 of the Beijing Subway (Chinese: 北京地铁11号线; pinyin: běijīng dìtiě shí yī háoxiàn) is a rapid transit rail line under planning in Beijing.

History

In 2006, Line 11 was originally designed as an L-shaped line from Wanliu to Dahongmen, which together with the L-shaped Line 10, form a subway ring route.[1] After Line 10 Phase II took over the entire ring route, Line 11 was displaced.

In January 2010, the government of Shijingshan District disclosed plans for a Line 11 in western Beijing that would traverse the Beijing Capital Steel complex and intersect with Lines 1 and 4.[2]

It will intersect with Line 16 at Hongliannanlu.[3]

References

  1. (Chinese) "北京再添三条地铁线 六号十一号线正岩土勘探" 北京青年报 2006-12-04
  2. (Chinese) "北京地铁M11线2020年启动建设 将纵贯首钢整个厂区" Jan. 13, 2010
  3. (Chinese)"北京地铁16号线车站设计方案展示" 2013.4.25
This article is issued from Wikipedia - version of the 6/28/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.