Kolkata Metro Line 4
Kolkata Metro Line 4 | |
---|---|
Overview | |
Type | Rapid transit |
System | Kolkata Metro |
Status | Under Construction |
Locale | Kolkata India |
Termini |
Noapara (south) Barasat (north) |
Stations | 10 |
Website | KMRC |
Operation | |
Operator(s) | KMRC |
Character | Elevated |
Technical | |
Line length | 18.50 kilometres (11.50 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | 750 V DC[1] using third rail |
Operating speed | 80 km/h (designed) |
The Line 4, or Noapara Barasat Line of the Kolkata Metro. It is a 18.50 km long metro from Noapara to Barasat is under construction, It is being built by RVNL. It is a fully elevated corridor. It will have an interchange station at the airport with line 6 of the Kolkata metro.
Stations
The stations of this Corridors are: Template:Kolkata Metro Line 3 Route
Line 4 | |||||||||
---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Location | Opening | Connections | Layout | Coordinates | Notes | ||
English | Bengali | Hindi | |||||||
1 | Noapara | নোয়াপাড়া | Noapara | 10 July 2013 | Kolkata Metro Line 1 | Elevated | Largest station of the Kolkata Metro. Also known as Ma Sarada Devi station | ||
2 | Maulana Abul Kalam Azad | মৌলানা আবুল কালাম আজাদ | Dum Dum Cantonment | Under construction | Dum Dum Cantonment Railway Station(Eastern Suburban Railways) | Elevated | Also known as Dum Dum Cantonment | ||
3 | Jibanananda | জিবনানন্দ | 1 no. airport gate | Under construction | Jessore Road railway station | At Grade | Also known as Jessore Road | ||
4 | Jai Hind | জয় হিন্দ | Kolkata Airport | Under construction | Kolkata Metro Line 6 (Under Construction); Biman Bandar railway station | Under Ground | Also known as Biman Bandar | ||
5 | Loknath | লোকনাথ | Birati | Under construction | Elevated | Also known as Birati | |||
6 | Mother Teresa | মাদার টেরেসা | New Barrackpore | Under construction | Elevated | Also known as New Barrackpore | |||
7 | Priya Thakur | প্রিয় ঠাকুর | Madhyamgram | Under construction | Elevated | Also known as Madhyamgram | |||
8 | Bibhuti Bhushan | বিভূতি ভূষণ | Hridaypur | Under construction | Elevated | Also known as Hridaypur | |||
9 | Barasat | বারাসাত | Barasat | Under construction | Barasat railway Station(Indian Railways) | Elevated | |||
Progress of Dum Dum Cantonment metro station
An amount of Rs 127 crore contract to build this station along with a mostly at-grade 2.16 km section from the Baghjola Canal to the existing ramp of the Airport Circular Railway track was awarded to Senbo Engineering all the way back in June 2011. Since then, the station’s civil structure has been built, but work for the at-grade track section has not been able to commence due to land acquisition issues on a horrific scale along the line’s proposed alignment which the West Bengal government has taken no interest in resolving.
See also
- Kolkata Metro
- List of Kolkata metro stations
- Kolkata Metro Rolling Stock
- List of rapid transit systems
- Kolkata tram
- Kolkata Lightrail
- Kolkata Monorail
- Kolkata Suburban Railway