Vivaldi Residences Davao
Vivaldi Residences Davao | |
---|---|
General information | |
Status | Under construction |
Type | Residential |
Address | C.M. Recto Cor. R. Magsaysay Streets |
Town or city | Davao City |
Country | Philippines |
Groundbreaking | 2015 |
Estimated completion | 2018 |
Height | 150 metres (490 ft) |
Technical details | |
Floor count | 37 |
The Vivaldi Residences Davao is a 37-storey residential tower located at the corner of C.M. Recto and R. Magsaysay streets in Davao City, Philippines.
Construction
The building's foundation works was commenced in June 2015. The bored piles were laid by Advanced Foundation Construction Systems. The foundation of the building measures 60 metres (200 ft) below and the land of the building covers 1,004 square metres (10,810 sq ft). By March 2016, the foundation works is 95 percent complete with 67 out of 70 bored piles already laid. The foundation work alone costs around ₱120 million. The whole Vivaldi Residenes Davao project is projected to cost around ₱1 billion.[1] The building is scheduled to be completed on April 2018.[2]
Architecture and design
Vivaldi Residences Davao will have 37 floors and will rise 118 metres (387 ft) above ground[1] making it among the highest buildings in Davao City.[2]
References
- 1 2 Perez, Ace June Rell (20 March 2016). "Vivaldi foundation now 95% complete". Sun Star Davao. Retrieved 6 August 2016.
- 1 2 Cudis, Christine Joice (26 October 2015). "Vivaldi set for completion in 2018". Sun Star Davao. Retrieved 6 August 2016.
"Mindanao Times". August 18, 2015. Retrieved 2015-10-10.