Upper Gotvand Dam

Upper Gotvand Dam

Upper Gotvand Reservoir
Location of Upper Gotvand Dam in Iran
Country Iran
Location Gotvand, Gotvand County, Khuzestan Province
Coordinates 32°15′58″N 48°56′09″E / 32.26611°N 48.93583°E / 32.26611; 48.93583Coordinates: 32°15′58″N 48°56′09″E / 32.26611°N 48.93583°E / 32.26611; 48.93583
Status Operational
Construction began August 2004
Opening date 2012
Owner(s) Iran Water & Power Resources Development Co.
Dam and spillways
Type of dam Earthfill dam
Impounds Karun River
Height (foundation) 180 m (591 ft)[1]
Length 760 m (2,493 ft)
Width (crest) 15 m (49 ft)
Width (base) 1,075 m (3,527 ft)
Dam volume 28,500,000 m3 (1.006468002×109 cu ft)
Spillways 4
Spillway type Service, controlled ogee-type
Spillway capacity 17,500 m3/s (618,007 cu ft/s)
Reservoir
Creates Upper Gotvand Reservoir
Total capacity 4,500,000,000 m3 (3,648,209 acre·ft)
Catchment area 32,425 km2 (12,519 sq mi)
Surface area 96.5 km2 (37 sq mi)
Power station
Commission date 2012
Type Conventional
Turbines 4 x 250 MW Francis-type
Installed capacity 1,000 MW (currently)
2,000 MW (with phase 2)
Annual generation 4,500 GWh

Upper Gotvand Dam, or simply the Gotvand Dam, is an embankment dam on the Karun River about 12 km (7.5 mi) northeast of Gotvand in Khuzestan Province, Iran. It currently has an installed capacity of 1,000 MW with another 1,000 MW in the works for a second phase. Studies for the Karun River began in the 1960s and specific designs on the Upper Gotvand were presented in 1967, 1975 and 1982. After the design and location were chosen, a further study was carried out in 1997, the same year preliminary construction (roads, bridges, river diversion) began. The river was diverted by April 2003 and excavation began soon thereafter. After completion of the dam, impounding of its reservoir began on 30 July 2011 during a ceremony attended by Iranian President Mahmood Ahmadinejad. The first generator of phase one was commissioned on 5 May 2012, two more by 18 September 2012 and the final in November 2012.[2][3] Ahmadinejad was again present for the dam's inauguration on 22 April 2013.[4] Phase 2 is estimated to be complete in 2015 and the dam is going to become one of Iran's largest power stations and is already its tallest earth-fill dam.[5][6]

Downstream of the Upper Gotvand Dam is the 22 m (72 ft) high Lower Gotvand Dam at 32°16′32.51″N 48°50′8.52″E / 32.2756972°N 48.8357000°E / 32.2756972; 48.8357000 (Lower Gotvand Dam). Constructed from 1975 to 1977, it serves to divert portions of the river into two canals for the irrigation of 42,000 ha (100,000 acres) of farmland.[7][8]

See also

References

  1. "Upper Gotvand Project: Technical Information". Iran Water & Power Resources Development Co. Retrieved 6 January 2012.
  2. "News: Third Unit of Gotvand connected to Iran's Power Grid". Iran Water and Power Resources Development Co. Retrieved 9 December 2012.
  3. "News: Gotvand Hydro Generation More than 1300 GWhr". Iran Water and Power Resources Development Co. 27 April 2013. Retrieved 6 May 2013.
  4. "News: Gotvand Dam and Hydropower Plant Inaugurated in the Presence of President Ahmadinejad". Iran Water and Power Resources Development Co. 29 April 2013. Retrieved 6 May 2013.
  5. "Upper Gotvand Project". IWPCO. Retrieved 26 February 2011.
  6. "News: Iran's Highest Earth-fill Dam Impounded in the Presence of President Ahmadinejad". Iran Water and Power Resources Development Co. Retrieved 3 September 2011.
  7. "Susitna Hydroelectric Project" (PDF). Harza Engineering Company. Retrieved 20 January 2015.
  8. "Gotvan regulatory barrier" (in Persian). Iran Dam Info. Retrieved 20 January 2015.


This article is issued from Wikipedia - version of the 7/10/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.