USNS Henry Eckford (T-AO-192)

This article is about the U.S. Navy oiler. For the 1824 steamboat, see Henry Eckford (ship). For the naval architect, see Henry Eckford (shipbuilder). For the British horticulturist, see Henry Eckford (horticulturist).
USNS Henry Eckford (T-AO-192) (left) and USNS Benjamin Isherwood (T-AO-191) preparing for long-term storage.
History
United States
Name: USNS Henry Eckford
Namesake: Henry Eckford (1775-1832), naval architect and shipbuilder
Awarded: 6 May 1985
Builder: Pennsylvania Shipbuilding Company, Philadelphia, Pennsylvania, and Tampa Shipbuilding Company, Tampa, Florida
Laid down: 22 January 1987
Launched: 22 July 1989
In service: Never
Struck: 10 November 1997
Fate:
  • Construction contract canceled 15 August 1993 when ship 84% complete
  • Sold for scrapping July 2011
General characteristics
Class and type: Henry J. Kaiser-class fleet replenishment oiler
Type: Fleet replenishment oiler
Tonnage: 31,200 deadweight tons
Displacement:
  • 9,500 tons light
  • Full load variously reported as 42,382 tons and 40,700 long tons (41,353 metric tons)
Length: 677 ft (206 m)
Beam: 97 ft 5 in (29.69 m)
Draft: 35 ft (11 m) maximum
Installed power:
  • 16,000 hp (11.9 MW) per shaft
  • 34,442 hp (25.7 MW) sustained total
Propulsion: Two medium-speed Colt-Pielstick PC4-2/2 10V-570 diesel engines, twin shafts, controllable-pitch propellers
Speed: 20 knots (37 km/h; 23 mph)
Capacity:
Complement: 103 (18 civilian officers, 1 U.S. Navy officer, 64 merchant seamen, 20 U.S. Navy enlisted personnel)
Armament:
Aircraft carried: None
Aviation facilities: Helicopter landing platform
Notes:
  • Five refueling stations
  • Two dry cargo transfer rigs

United States Naval Ship USNS Henry Eckford (T-AO-192) was a Henry J. Kaiser-class fleet replenishment oiler of the United States Navy. She was never completed.

Construction

Henry Eckford, the sixth Henry J. Kaiser-class ship, was laid down by the Pennsylvania Shipbuilding Company in Philadelphia, Pennsylvania, on 22 January 1987. Her construction encountered numerous problems. Although she was launched on 22 July 1989, her construction contract with Pennsylvania Shipbuilding was cancelled on 31 August 1989. Along with her unfinished sister ship USNS Benjamin Isherwood (T-AO-191), the incomplete Henry Eckford was towed to the Philadelphia Naval Shipyard in Philadelphia on 27 October 1989 for lay-up.

A new contract was awarded on 16 November 1989 to the Tampa Shipbuilding Company of Tampa, Florida, to complete Henry Eckford, and she was towed from Philadelphia to Tampa. However, construction problems continued, and that contract also was canceled, on 15 August 1993, when the ship was 84 percent complete. Cost overruns had run into the millions of U.S. dollars.

Reserve

The Navy decided that completion of Henry Eckford as an oiler was no longer necessary, and considered converting her into an ammunition ship, but the conversion was found to be cost-prohibitive. Instead, the nearly complete Henry Eckford was turned over to the Maritime Administration and towed up the James River in Virginia, where she remained in reserve in the National Defense Reserve Fleet as part of the United States Navy's James River Reserve Fleet at Lee Hall, Virginia. She was struck from the Navy List on 10 November 1997, and her title was transferred to the Maritime Administration on 2 February 1998. She and Benjamin Isherwood were the only units of the 18-ship Henry J. Kaiser class not to be completed.

Scrapping

On 19 July 2011, Henry Eckford departed for Brownsville, Texas, to be recycled by International Shipbreaking Limited.

References

Wikimedia Commons has media related to USNS Henry Eckford (T-AO-192).
This article is issued from Wikipedia - version of the 10/10/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.