Trimdon Grange Wind Farm
Trimdon Grange Wind Farm | |
---|---|
Location of Trimdon Grange Wind Farm in County Durham | |
Country | England, United Kingdom |
Location | near Trimdon Grange, County Durham |
Coordinates | 54°42′47″N 1°25′10″W / 54.7130°N 1.41944°WCoordinates: 54°42′47″N 1°25′10″W / 54.7130°N 1.41944°W |
Status | Operational |
Commission date | October 2008 |
Owner(s) | EDF Energy |
Wind farm | |
Avg. site elevation | 446 ft |
Power generation | |
Units operational | 4 × 1.3 MW |
Make and model | Nordex: N60 |
Nameplate capacity | 5.2 MW |
Trimdon Grange Wind Farm is an onshore wind farm located near Trimdon Grange, County Durham, England. Commissioned in October 2008 it consists of four 1.3MW Nordex N60 turbines giving a total capacity of 5.2MW. It was developed by EDF and is operated by Cumbria Wind Farms.[1][2]
The proposed location of the wind farm caused controversy in 2004 when an agent of Tony Blair, then Prime Minister, wrote to a local action group, Trimdon Area Group Against Wind Farms claiming that the site was unsuitable. The location is around a mile from Tony Blair's old constituency house.[3]
References
This article is issued from Wikipedia - version of the 7/26/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.