South German natural gas pipeline

South German natural gas pipeline
Location
Country Germany
General direction east-west
From Burghausen
To Lampertheim
General information
Type natural gas
Partners E.ON, Wingas
Operator SEL Süddeutsche Erdgasleitung
Commissioned canceled
Technical information
Length 500 km (310 mi)

South German natural gas pipeline (German: Süddeutsche Erdgasleitung (SEL)) was a natural gas pipeline project in Germany. It was planned to run from Burghausen on the German-Austrian border to Lampertheim, state of Hesse. The length of the pipeline was to be about 500 kilometres (310 mi) and the diameter was to be 1,200 millimetres (47 in). The pipeline was to be constructed jointly by E.ON Ruhrgas and Wingas, a joint venture of Wintershall and Russian Gazprom. The project was expected to cost €600 million ($759.2 million). Project was stopped in November 2008, mainly due to difficulties in financing. According to Wingas, the pipeline project was not economically sustainable; hence the halt of operations.[1]

References

This article is issued from Wikipedia - version of the 4/23/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.