Robin Hood Line

Robin Hood Line

A class 158 on a Nottingham service
Overview
Type Heavy rail
System National Rail
Status Operational
Locale Nottinghamshire
Derbyshire
East Midlands
Termini Worksop
Nottingham
Stations 13
Operation
Opened 1848[1]
Closed 1960s
Reopened 1993–1998
Owner Network Rail
Operator(s) East Midlands Trains
Rolling stock Class 153 Super Sprinter
Class 156 Super Sprinter
Class 158 Express Sprinter
Technical
Number of tracks 1–2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

Robin Hood Line

Legend

Sheffield to Lincoln Line

Worksop
Whitwell
Creswell
Langwith-Whaley Thorns
Freight route
to High Marnham Test Track
Shirebrook
Mansfield Woodhouse
Mansfield
Sutton Parkway
Kirkby-in-Ashfield
Freight route
to Pye Bridge
Annesley
Newstead
Linby
Hucknall Nottingham Express Transit
Bulwell Nottingham Express Transit

Nottingham Express Transit

Erewash Valley Line
Radford

Midland Main Line
Nottingham Nottingham Express Transit
NET Phase Two
Nottingham to Grantham Line

The Robin Hood Line is a railway line running from Nottingham to Worksop, Nottinghamshire. The stations between Shirebrook and Whitwell (inclusive) are in Derbyshire.

Passenger services are operated by East Midlands Trains. The line in its present form opened to passengers in stages between 1993 and 1998. Following the Beeching cuts of the 1960s, the line had been freight-only. The cuts had left Mansfield as one of the largest towns in Britain without a railway station.

History

The majority of the current Robin Hood Line re-uses the former Midland Railway (MR) route from Nottingham to Worksop. However, due to rationalisation leading to track removal in order to save the costs of maintaining the tunnel north of Annesley the through route was severed in the 1970s.[2]

Northwards from Nottingham, the freight-only line remained intact as far as Newstead, where it had served the now closed Newstead Colliery.[2]

Southwards from Worksop, the line followed the old MR route as far as Sutton-in-Ashfield. Between Sutton-in-Ashfield and Kirkby-in-Ashfield, the line was diverted in 1972 to take the former Great Northern Railway (GNR) route through the area.[3] This allowed British Rail to sell land right in the centre of Kirkby-in-Ashfield whilst keeping a freight route through the town. After crossing the town on the GNR route, the line re-joined the old MR route to Pye Bridge, near Ironville but the connection between Kirkby-in-Ashfield and Newstead was closed and the tunnel filled in.[2]

When plans for the Robin Hood Line were drawn up, it was vital in the interest of keeping costs down to make as much use of the existing infrastructure as possible so, rather than trying to buy back the land to rebuild the line through the centre of Kirkby-in-Ashfield, the existing GNR diversion was kept and a new stretch of railway built to re-create the missing link between Kirkby-in-Ashfield and Newstead.[2]

North of Newstead, at Annesley, both the Great Central Railway (GCR) and the Midland Railway had driven tunnels through the picturesque Robin Hood Hills, but since both lines closed, both tunnels had been filled in.[3] The GCR's tunnel had been at a lower level than the MR's and so was much longer. It therefore proved cheaper to re-excavate the MR's tunnel, which was found to be in excellent condition.[2]

The new service from Nottingham to Newstead opened in 1993 although Bulwell station opened only in 1994. It was extended to Mansfield Woodhouse in 1995, with Kirkby-in-Ashfield station opening in 1996. The through passenger route from Nottingham to Worksop opened in 1998.

Since then the section between Bulwell and Hucknall has been converted from double track to single track to allow space for the new Nottingham Express Transit tramway, which follows the route as far north as Hucknall and opened in March 2004.

Currently (July 2015), the Robin Hood Line operates a Monday to Saturday service between 05:30am and 10:30pm. During the day, trains run at half-hourly intervals between Nottingham and Mansfield Woodhouse, with one service an hour continuing to Worksop with a total journey time of 67 minutes.[4]

A Sunday service began on 7 December 2008, with ten trains running between Nottingham and Mansfield Woodhouse between 09:15am and 10:30pm. Four of those continued to Worksop.[5] The Sunday service was funded by Derbyshire County Council and Nottinghamshire County Council. An understanding was made with the Department for Transport that, if the patronage reached an agreed threshold after two years, they would consider taking over the service and incorporate it within the East Midlands Trains franchise. However, this service was not a commercial success north of Mansfield Woodhouse, and Nottinghamshire County Council decided to reduce its funding and prioritise running a reduced Sunday service from 22 May 2011. The service runs eight times each Sunday between Nottingham and Mansfield Woodhouse and return.[4]

Proposed extension

Just north of Shirebrook station is a junction with a freight branch line that was used for coal traffic to High Marnham power station via Warsop, Edwinstowe and Ollerton. Following closure of the power station the line is disused but has been kept open and fully maintained as a test track for driver training.[6] In mid-2009 Nottinghamshire County Council commissioned a feasibility study to consider a plan to extend the Robin Hood Line along this route by extending the current hourly service between Nottingham and Mansfield Woodhouse to Ollerton, calling at Shirebrook, Warsop and Edwinstowe (for Sherwood Forest Center Parcs holiday resort).[7]

References

  1. BBC Nottingham: Robin Hood line history Accessed 19 April 2011
  2. 1 2 3 4 5 Sisson, Robin (March 2007). "Return to Robin Hood". Today's Railways UK. Vol. 63. Sheffield: Platform 5 Publishing Ltd. pp. 48–55.
  3. 1 2 Anderson, P. Howard (1985). Forgotten Railways. II The East Midlands (2nd ed.). Newton Abbott: David St John Thomas. p. 206. ISBN 0-946537-20-8.
  4. 1 2 "Timetable: Local Services" (PDF). East Midlands Trains. May 2015. Retrieved July 31, 2015.
  5. "Robin Hood Line Sunday Service". Nottinghamshire County Council. December 2008.
  6. "Hope for Robin Hood branch line". BBC. 9 August 2009. Retrieved 21 February 2010.
  7. Lambourne, Helen (22 July 2009). "New bid to extend rail link to Ollerton". Worksop Today. Retrieved 21 February 2010.

Further reading

  • Millar, John (15–28 February 1995). Kelly, Peter, ed. "Robin Hood marches north". RAIL. No. 246. pp. 64–68. ISSN 0953-4563. 
  • "Robin Hood Line bridges the final 15-mile gap". RAIL. No. 325. EMAP Apex Publications. 25 February – 10 March 1998. p. 10. ISSN 0953-4563. OCLC 49953699. 
This article is issued from Wikipedia - version of the 7/28/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.