Riddlesdown railway station
Riddlesdown | |
---|---|
Riddlesdown station eastern entrance and path | |
Riddlesdown Location of Riddlesdown in Greater London | |
Location | Riddlesdown |
Local authority | London Borough of Croydon |
Managed by | Southern |
Station code | RDD |
DfT category | E |
Number of platforms | 2 |
Fare zone | 6 |
National Rail annual entry and exit | |
2010–11 | 0.355 million[1] |
2011–12 | 0.360 million[1] |
2012–13 | 0.361 million[1] |
2013–14 | 0.368 million[1] |
2014–15 | 0.406 million[1] |
Railway companies | |
Original company | Southern Railway |
Key dates | |
5 June 1927 | Opened |
Other information | |
Lists of stations | |
External links | |
WGS84 | 51°19′56″N 0°05′59″W / 51.3323°N 0.0996°WCoordinates: 51°19′56″N 0°05′59″W / 51.3323°N 0.0996°W |
London Transport portal UK Railways portal |
Riddlesdown railway station serves Riddlesdown in the London Borough of Croydon in south London, on the Oxted line. The station and all trains serving it are operated by Southern, and it is in Travelcard Zone 6.
Platforms
Platform 1 is the platform for trains towards Croydon and London.
Platform 2 is the platform towards East Grinstead.
The station is unusual amongst suburban London stations in that there is no means of crossing between the platforms. The platforms are reached via separate footpaths from Lower Barn Road, either side of the bridge that takes the railway over the road. The ticket office is on Platform 1.
On the London-bound platform 1, there is a manned ticket office (staffed for only part of the day) and waiting room.
There are self-service ticket machines and Oyster scanners on both platforms.
Services
The typical off-peak service from the station is two trains per hour to East Grinstead and two trains per hour to London Victoria. In the morning and evening peak period trains also run to and from London Bridge.
Services between London Bridge and Uckfield pass the station, but stop during weekday morning peak times.
Services from East Grinstead to London Bridge are due to transfer to Thameslink in 2018. Enabling direct services to Bedford and Cambridge.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Sanderstead | Southern Oxted Line |
Upper Warlingham |
References
- 1 2 3 4 5 "Station usage estimates". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
External links
Wikimedia Commons has media related to Riddlesdown railway station. |
- Train times and station information for Riddlesdown railway station from National Rail