A plunger lift is an artificial lift method of deliquifying a natural gas well. A plunger is used to remove contaminants from productive natural gas wells, such as water (in liquid, mist, or ice forms), sand, oil and wax.

The basics of the plunger is to open and close the well shutoff valve at the optimum times, to bring up the plunger and the contaminants and maximize natural gas production. A well without a deliquification technique will stop flowing or slow down and become a non-productive well, long before a properly deliquified well. [1]

The plunger lift has low energy cost, low environmental impact, low capital investment and low maintenance cost. Modern wellhead controllers offer a variety of criteria to control the plunger. The original controllers were just timers, with fixed open and close cycles.

Measuring the various pressures in the system allows intelligent and reactive control. The pressures often measured are casing, tubing, line, and differential (DP). The other items measured are plunger arrival times, flow rates, temperatures and status of various auxiliary equipment: oil tank level, compressor status.

Open Well Criteria

Close Well Criteria

Notes

  1. http://blogs.mail.ru/mail/v_sh38/
  2. Foss, D.L., and Gaul, R.B., "Plunger Lift Performance Criteria with Operating Experience - Ventura Avenue Field", (API Drilling and Production Practice,) 1965.

References

Patents

This article is issued from Wikipedia - version of the 3/31/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.