Bucharest, the capital of Romania, is the site of 100 completed high-rises, 4 of which stand taller than 100 metres (328 ft) and 71 of which stand taller than 50 metres (164 ft).[1] The tallest skyscraper in the city and Romania is the SkyTower, which rises 137 m (449 ft) in Sector 1.[2] The city has been the site of several construction projects that mostly consist of new office buildings, residential towers and hotel developments.

Bucharest's history of high-rises began with the 1932 completion of the 14-storey Carlton Bloc.[3] The 47 m (154 ft) structure was, at the time of its completion, the tallest building in the city; it remained the tallest in Bucharest until the 53 m (174 ft) Telephone Palace was completed in 1934.[4][5] Bucharest underwent a major building boom during the communist regime which led to many systematization works.[6] During this time, the Casa Presei Libere became the tallest building in the city; the 104 m (341 ft) structure was also the tallest building in Romania until 2007, when the Tower Center International was completed.[2] The most recent high-rise construction project to be completed in Bucharest was the Globalworth Tower. The project consisted of a 118 m (387 ft) office building of 27 storeys.[7] The building, located on the Barbu Văcărescu street was completed in April 2016, becoming the 2nd-tallest building in the city.

As of June 2016, there are 25 buildings under construction in Bucharest that are planned to rise over 50 m (164 ft) in height. The largest construction projects in the city are the Orhideea Towers, The Bridge and the Globalworth Campus. The Orhideea Towers is an under-construction dual tower complex comprising one 17-floor 85 m (279 ft) tall building and one 13-floor 64 m (210 ft) tall building linked together by a skybridge.[8] The project is expected to be delivered by 2017.[9] The Bridge is another large project consisting of two 10 floor office buildings located next to the Orhideea towers.[10] The largest and most important project in construction is the Globalworth Campus consisting of three office buildings, two of which have 12 floors and one 14 floors. The 105,000 m2 (1,130,211 sq ft) complex will be at completion, in 2017, the largest office building complex in Bucharest and Romania surpassing the 92,855 m2 (999,483 sq ft) Iride Business Park owned by Immofinanz.[11][12] The original project of the Globalworth Campus included a fourth 25 floor building which was not included in the development.[13]

Tallest buildings


List of tallest buildings in Bucharest (black buildings are completed, gray ones are proposed or under construction)

This lists ranks Bucharest high-rises that stand at least 60 m (197 ft) tall, based on standard height measurement. This includes spires and architectural details but does not include antenna masts.

Rank Name Image Height
m (ft)
Floors Year Coordinates Notes
1 SkyTower 137 m (449 ft) 37 2012 44°28′42″N 26°6′14″E / 44.47833°N 26.10389°E / 44.47833; 26.10389 (SkyTower) Tallest building in Bucharest and Romania since completion in 2012[14]
2 Globalworth Tower 118 m (387 ft) 27 2016 44°28′46″N 26°6′8″E / 44.47944°N 26.10222°E / 44.47944; 26.10222 (Globalworth Tower) Second tallest building in Bucharest at completion in 2016[15]
3 Tower Center International 106.3 m (349 ft) 26 2008 44°27′16″N 26°4′52″E / 44.45444°N 26.08111°E / 44.45444; 26.08111 (Tower Center International) Was the tallest building in Bucharest between 2007 and 2012[16]
4 Casa Presei Libere 104 m (341 ft) 23 1956 44°28′51.36″N 26°4′16.35″E / 44.4809333°N 26.0712083°E / 44.4809333; 26.0712083 (Casa Presei Libere) Tallest building in Bucharest between 1956 and 2007
5 Asmita Gardens Tower 3 92.2 m (302 ft) 25 2009 44°24′23.7″N 26°7′28.2″E / 44.406583°N 26.124500°E / 44.406583; 26.124500 (Asmita Gardens) Tallest residential building in Romania[17]
6 InterContinental Bucharest 87 m (285 ft) 25 1970 44°26′14″N 26°6′8″E / 44.43722°N 26.10222°E / 44.43722; 26.10222 (InterContinental) Tallest hotel in Romania[18]
7 Palace of the Parliament 84 m (276 ft) 12 1997 44°25′39″N 26°5′15″E / 44.42750°N 26.08750°E / 44.42750; 26.08750 (Palace of the Parliament) Largest building in Romania[19]
8 Bucharest Financial Plaza 83 m (272 ft) 18 1997 44°25′58″N 26°5′48″E / 44.43278°N 26.09667°E / 44.43278; 26.09667 (InterContinental) Headquarters of BCR Bank
9 BRD Tower 82 m (269 ft) 19 2003 44°27′9″N 26°5′1″E / 44.45250°N 26.08361°E / 44.45250; 26.08361 (BRD Tower) Headquarters of BRD – Groupe Société Générale
10 Asmita Gardens Tower 6 80 m (260 ft) 20 2009 44°24′23.7″N 26°7′28.2″E / 44.406583°N 26.124500°E / 44.406583; 26.124500 (Asmita Gardens) Second tallest residential building in Romania[17]
10 Euro Tower 80 m (260 ft) 19 2009 44°27′25.5″N 26°6′23.9″E / 44.457083°N 26.106639°E / 44.457083; 26.106639 (Euro Tower) The first green building in Bucharest[20]
10 Nusco Tower 80 m (260 ft) 20 2010 44°28′49.6″N 26°6′13.9″E / 44.480444°N 26.103861°E / 44.480444; 26.103861 (Nusco Tower) [21]
13 Doamna Ghica Plaza A 78 m (256 ft) 24 2011 44°27′7″N 26°8′41.6″E / 44.45194°N 26.144889°E / 44.45194; 26.144889 (Doamna Ghica Plaza) The complex has one 24 floor tower and four 16 floor towers[22]
14 Monaco Towers I 77 m (253 ft) 20 2009 44°22′15.6″N 26°8′27.6″E / 44.371000°N 26.141000°E / 44.371000; 26.141000 (Monaco Towers) [23]
14 Monaco Towers II 77 m (253 ft) 20 2009 44°22′15.6″N 26°8′27.6″E / 44.371000°N 26.141000°E / 44.371000; 26.141000 (Monaco Towers) [23]
16 Cathedral Plaza 75 m (246 ft) 19 2011 44°26′32.6″N 26°5′31.1″E / 44.442389°N 26.091972°E / 44.442389; 26.091972 (Cathedral Plaza) The building might endanger the structural integrity of the nearby St. Joseph Cathedral[24]
17 TVR Tower 74 m (243 ft) 13 1968 44°27′49.1″N 26°5′21″E / 44.463639°N 26.08917°E / 44.463639; 26.08917 (TVR Tower) Headquarters of the Romanian National Television [25]
18 City Gate North Tower 72 m (236 ft) 18 2009 44°28′42.5″N 26°4′15.7″E / 44.478472°N 26.071028°E / 44.478472; 26.071028 (City Gate Towers) [26]
18 City Gate South Tower 72 m (236 ft) 18 2009 44°28′39.3″N 26°4′17″E / 44.477583°N 26.07139°E / 44.477583; 26.07139 (City Gate Towers) [26]
18 Crystal Tower 72 m (236 ft) 15 2011 44°27′9.4″N 26°5′43.5″E / 44.452611°N 26.095417°E / 44.452611; 26.095417 (Crystal Tower) The first private office building in Bucharest with a heliport and it serves as the headquarters of the Dutch banking group ING.[27]
18 Millennium Business Center 72 m (236 ft) 19 2009 44°26′15.2″N 26°6′36.7″E / 44.437556°N 26.110194°E / 44.437556; 26.110194 (Millennium Business Center) On June 27, 2009 the building went on fire after a big billboard exploded (probably) because it was struck by lightning[28]
22 Alia Apartments 70 m (230 ft) 20 2010 44°27′51.1″N 26°4′23.8″E / 44.464194°N 26.073278°E / 44.464194; 26.073278 (Alia Apartments) [29]
22 Charles de Gaulle Plaza 70 m (230 ft) 16 2005 44°27′55.3″N 26°5′14.1″E / 44.465361°N 26.087250°E / 44.465361; 26.087250 (Charles de Gaulle Plaza) Has the fastest elevators in Romania having a speed of 2.5 m/s[30]
22 Sheraton Bucharest Hotel 70 m (230 ft) 18 2001 44°26′48.2″N 26°5′56.6″E / 44.446722°N 26.099056°E / 44.446722; 26.099056 (Sheraton Bucharest Hotel) Originally the Howard Johnson Grand Plaza Hotel changed its name to Sheraton Bucharest on August 28, 2015[31]
25 Blocul Sarbesc 69 m (226 ft) 18 1975 44°26′6″N 26°0′57.8″E / 44.43500°N 26.016056°E / 44.43500; 26.016056 (Blocul Sarbesc) [32]
25 Victoria Complex 69 m (226 ft) 18 2009 44°27′5.8″N 26°5′7.5″E / 44.451611°N 26.085417°E / 44.451611; 26.085417 (Victoria Complex) [33]
27 Business Development Center 68 m (223 ft) 17 2004 [34]
27 Unicredit Tower 64 m (210 ft) 16 2012 44°28′39.4″N 26°4′6″E / 44.477611°N 26.06833°E / 44.477611; 26.06833 (Victoria Complex) Headquarters of the Italian UniCredit Bank[35]
29 Doamna Ghica Plaza C 65 m (213 ft) 17 2011 44°27′7″N 26°8′41.6″E / 44.45194°N 26.144889°E / 44.45194; 26.144889 (Doamna Ghica Plaza) The complex has one 24 floor tower and four 16 floor towers[22]
29 Doamna Ghica Plaza E 65 m (213 ft) 17 2011 44°27′7″N 26°8′41.6″E / 44.45194°N 26.144889°E / 44.45194; 26.144889 (Doamna Ghica Plaza) The complex has one 24 floor tower and four 16 floor towers[22]
29 Doamna Ghica Plaza G 65 m (213 ft) 17 2011 44°27′7″N 26°8′41.6″E / 44.45194°N 26.144889°E / 44.45194; 26.144889 (Doamna Ghica Plaza) The complex has one 24 floor tower and four 16 floor towers[22]
29 Doamna Ghica Plaza I 65 m (213 ft) 17 2011 44°27′7″N 26°8′41.6″E / 44.45194°N 26.144889°E / 44.45194; 26.144889 (Doamna Ghica Plaza) The complex has one 24 floor tower and four 16 floor towers[22]
29 InCity Residences 1 65 m (213 ft) 17 2009 44°25′12.6″N 26°7′59.5″E / 44.420167°N 26.133194°E / 44.420167; 26.133194 (InCity Residences) [36]
29 InCity Residences 2 65 m (213 ft) 17 2009 44°25′12.6″N 26°7′59.5″E / 44.420167°N 26.133194°E / 44.420167; 26.133194 (InCity Residences) [37]
29 InCity Residences 3 65 m (213 ft) 17 2009 44°25′12.6″N 26°7′59.5″E / 44.420167°N 26.133194°E / 44.420167; 26.133194 (InCity Residences) [38]
29 InCity Residences 4 65 m (213 ft) 17 2009 44°25′12.6″N 26°7′59.5″E / 44.420167°N 26.133194°E / 44.420167; 26.133194 (InCity Residences) [39]
29 InCity Residences 5 65 m (213 ft) 17 2009 44°25′12.6″N 26°7′59.5″E / 44.420167°N 26.133194°E / 44.420167; 26.133194 (InCity Residences) [40]
29 PGV Tower 65 m (213 ft) 15 2006 44°24′29.2″N 26°5′45.9″E / 44.408111°N 26.096083°E / 44.408111; 26.096083 (PGV Tower) [41]
29 Rin Grand Hotel 65 m (213 ft) 15 2008 44°23′56.6″N 26°8′35.5″E / 44.399056°N 26.143194°E / 44.399056; 26.143194 (Rin Grand Hotel) Was the largest hotel in Europe with 1,459 rooms but reduced to 489 rooms at present[42]
40 Asmita Gardens Tower 1 64 m (210 ft) 20 2009 44°24′23.7″N 26°7′28.2″E / 44.406583°N 26.124500°E / 44.406583; 26.124500 (Asmita Gardens) [17]
40 Asmita Gardens Tower 2 64 m (210 ft) 20 2009 44°24′23.7″N 26°7′28.2″E / 44.406583°N 26.124500°E / 44.406583; 26.124500 (Asmita Gardens) [17]
40 Asmita Gardens Tower 4 64 m (210 ft) 20 2009 44°24′23.7″N 26°7′28.2″E / 44.406583°N 26.124500°E / 44.406583; 26.124500 (Asmita Gardens) [17]
40 Asmita Gardens Tower 5 64 m (210 ft) 20 2009 44°24′23.7″N 26°7′28.2″E / 44.406583°N 26.124500°E / 44.406583; 26.124500 (Asmita Gardens) [17]
40 Asmita Gardens Tower 7 64 m (210 ft) 20 2009 44°24′23.7″N 26°7′28.2″E / 44.406583°N 26.124500°E / 44.406583; 26.124500 (Asmita Gardens) [17]
40 BOS Tower 64 m (210 ft) 16 2007 44°28′52.6″N 26°6′13.5″E / 44.481278°N 26.103750°E / 44.481278; 26.103750 (BOS Tower) [43]
40 Piraeus Bank Tower 64 m (210 ft) 15 2009 44°26′1.9″N 26°0′31.1″E / 44.433861°N 26.008639°E / 44.433861; 26.008639 (Piraeus Bank Tower) The Romanian headquarters of the Greek Piraeus Bank is located in this building.[44]
40 Premium Plaza 64 m (210 ft) 15 2007 44°27′24.8″N 26°5′6.8″E / 44.456889°N 26.085222°E / 44.456889; 26.085222 (Premium Plaza) [45]
48 Sema Parc Building Two 63 m (207 ft) 15 2008 44°26′43.7″N 26°2′43.8″E / 44.445472°N 26.045500°E / 44.445472; 26.045500 (Sema Parc Building Two) [46]
49 Iuliu Maniu at Virtuţii Block 62 m (203 ft) 16 1982 44°26′4.7″N 26°2′8″E / 44.434639°N 26.03556°E / 44.434639; 26.03556 (Iuliu Maniu at Virtuţii Block) [47]
49 Vitan Platinum Towers 62 m (203 ft) 16 2011 44°24′46″N 26°7′32″E / 44.41278°N 26.12556°E / 44.41278; 26.12556 (Vitan Platinum Towers) Only one out of the original four towers was built[48]
51 Pantelimon at Şoseaua Iancului Block 61 m (200 ft) 19 1980 44°26′36″N 26°8′54.8″E / 44.44333°N 26.148556°E / 44.44333; 26.148556 (Pantelimon at Şoseaua Iancului Block) [49]
52 Bucharest Corporate Center 60 m (200 ft) 15 2007 44°26′52.9″N 26°4′54.3″E / 44.448028°N 26.081750°E / 44.448028; 26.081750 (Bucharest Corporate Center) Headquarters of the Italian insurance company Assicurazioni Generali
52 Griro Tower 60 m (200 ft) 15 1984 44°27′43.3″N 26°3′22.6″E / 44.462028°N 26.056278°E / 44.462028; 26.056278 (Griro Tower) [50]

Tallest under construction, proposed, and approved

Under construction

This lists buildings that are under construction in Bucharest and are planned to rise at least 60 m (200 ft). A floor count of 15 storeys is used as the cutoff for buildings whose heights have not yet been released by their developers.

Name Image Height m (ft)* Floors Year
(est.)
Coordinates Notes
Dâmbovița Center View of a project that consists of three buildings, a Ferris wheel and a mall 155 m (509 ft) 34 2015 44°28′42″N 26°06′14″E / 44.4783548°N 26.1038247°E / 44.4783548; 26.1038247 Construction on hold
Orhideea Towers
85 m (279 ft) 17 2017 44°26′38.4″N 26°3′35.3″E / 44.444000°N 26.059806°E / 44.444000; 26.059806 (Orhideea Towers) Two towers, first 85 m (279 ft) high and second 64 m (210 ft) high[9]
Sema Parc Hotel
75 m (246 ft) 25 2010 44°15′46″N 26°13′59″E / 44.2627°N 26.233°E / 44.2627; 26.233 Construction on hold [51]
The Mark
70 m (230 ft) 15 2018 44°27′46.5″N 26°3′21.3″E / 44.462917°N 26.055917°E / 44.462917; 26.055917 (The Mark) [52]

Approved

This lists buildings that are approved in Bucharest and are planned to rise at least 60 m (200 ft). A floor count of 15 storeys is used as the cutoff for buildings whose heights have not yet been released by their developers.

Name Height Floors Year
(est.)
Notes
Sema Parc Tower 140 m (460 ft) 42 - [53]
Sema Parc Residential Tower 1 72 m (236 ft) 24 - [54]
Sema Parc Residential Tower 2 72 m (236 ft) 24 - [55]
Sema Parc Residential Tower 3 72 m (236 ft) 24 - [56]
Sema Parc Building Four 63 m (207 ft) 15 - [57]

Proposed

This lists buildings that are proposed in Bucharest and are planned to rise at least 30 m (98 ft). A floor count of 15 storeys is used as the cutoff for buildings whose heights have not yet been released by their developers.

Name Height* Floors Year
(est.)
Notes
Dorobanţi Tower 200 (656) 50 2013 Would stand as the tallest building in the city upon completion[58]
Tron Tower 105 (344) 25 2010 [59]
Kiseleff Business Plaza 91 (299) 31 2013 [60]
Olympic Tower 33 [61]
Politehnica Office Tower 36 [62]
Carol Tower 35 2013 [63]
Cuprom Tower 19 2013 Would become the largest office building in the city by floor area upon completion[64]
Prime Towers 17 2013 [65]

* Table entries without text indicate that information regarding building heights has not yet been released.

Timeline of tallest buildings

This lists buildings that once held the title of tallest building in Bucharest. The Turnul Colţei was the tallest structure in Bucharest from 1714 until 1888; because the bell tower was not a habitable building, it never stood as the tallest building in the city, but is included in this table for comparative purposes.

Name Image Location Years as tallest Height
m (ft)
Floors Coordinates Reference
Turnul Colței Drawing of a tall tower with a clock and a tapering pyramidal roof; a status is located on top of the pointed roof near today's University Square [Note D] 50 (164) 2 44°26′6.54″N 26°6′10.72″E / 44.4351500°N 26.1029778°E / 44.4351500; 26.1029778 [66]
Foișorul de Foc Ground-level view a tower with a circular cross section and a tapering spire between Obor, Calea Moşilor and Nerva-Traian streets 1890–1932 42 (138) 4 44°26′25.20″N 26°7′14.12″E / 44.4403333°N 26.1205889°E / 44.4403333; 26.1205889 [67]
Carlton Bloc[E] between Magheru and Regala streets 1932–1934 47 (154) 14 44°26′24.20″N 26°7′15.12″E / 44.4400556°N 26.1208667°E / 44.4400556; 26.1208667 [3]
Telephone Palace Ground-level view of a 10-storey building; the exterior has a tan hue with dark windows and a higher front side Calea Victoriei 1934–1956 53 (174) 10 44°27′10.54″N 26°5′51.33″E / 44.4529278°N 26.0975917°E / 44.4529278; 26.0975917 [4][5]
Casa Presei Libere Casa Scînteii on the reverse of a 100-lei banknote, 1952 Presei Libere Square 1956–2007 104 (341) 14 44°28′51.36″N 26°4′16.35″E / 44.4809333°N 26.0712083°E / 44.4809333; 26.0712083 [68]
Tower Center International tall blue building with trees Victoria Square 2007–2012 120 (394) 26 44°27′16″N 26°04′52″E / 44.45448°N 26.08124°E / 44.45448; 26.08124 [2]
Floreasca City Center tall buildings alongside road Calea Floreasca 2012–present 137 (449) 37 44°28′42″N 26°06′13″E / 44.4782199°N 26.1036337°E / 44.4782199; 26.1036337 [69]

See also

Notes

A. ^ This height figure is an estimate based on the building's floor heights; official height figures have not been released by Monte Carlo Palace's developer.
B. ^ This height figure is an estimate based on the building's floor heights; official height figures have not been released by Olympia Tower's developer.
C. ^ This height figure is an estimate based on the building's floor heights; official height figures have not been released by Anchor Plaza's developer.
D. ^ Because the Turnul Colţei was not a habitable building, it never held the title of tallest building in Bucharest. The tower was, however, the tallest free-standing structure in the city from 1714 until 1888. The building's clock tower was destroyed on October 14, 1802 by an earthquake.[70] In 1888, the building was demolished.[71]
E. ^ This building was destroyed by an earthquake on November 10, 1940.[72]

References

General
Specific
  1. "Tall Buildings of Bucharest". Emporis.com. Retrieved 2016-06-24.
  2. 1 2 3 "Emporis - Bucharest". Emporis.com. Retrieved 2015-11-02.
  3. 1 2 "Bucureşti, 1977: înainte şi după". Evenimentul Zilei (in Romanian). 2009-08-08. Retrieved 2009-08-09.
  4. 1 2 "Palatul Telefoanelor un simbol al Bucurestiului" (in Romanian). gff.ro. Retrieved 2009-08-06.
  5. 1 2 "Consolidarea Palatului Telefoanelor" (in Romanian). rotaryconstructii.ro. Retrieved 2009-08-17.
  6. Giurescu, Constantin. Patrimoniul Arhitectural al Secolului XX. Arhitectura Art-Deco, Căutările naţionale - arhitectura neoromânească (in Romanian). 1. Bucharest. pp. 198–199.
  7. "A doua cea mai înaltă clădire de birouri din Bucureşti după Sky Tower îşi schimbă numele" (in Romanian). zf.ro. Retrieved 2016-06-24.
  8. "Orhideea Towers". CA Immo. Retrieved 24 June 2016.
  9. 1 2 "Orhideea Towers". Porr Construct. Retrieved 24 June 2016.
  10. "Bog'art va construi prima fază a proiectului The Bridge, în valoare de 60 mil.euro". Ziarul financiar. Retrieved 24 June 2016.
  11. "Cel mai mare parc de afaceri din țară se va ridica peste stația de metrou Pipera". bucurestiivechisinoi.ro. Retrieved 24 June 2016.
  12. "Globalworth Real Estate vrea sa construiasca cel mai mare parc de afaceri din Romania". businessavenue.ro. Retrieved 24 June 2016.
  13. "Globalworth Campus". globalworth.com. Retrieved 24 June 2016.
  14. "Sky Tower, Bucuresti - cea mai inalta cladire din capitala si din tara" (in Romanian). infoghidromania.com. Retrieved 25 June 2016.
  15. "A doua cea mai înaltă clădire din Bucureşti îşi schimbă numele" (in Romanian). gandul.info. Retrieved 25 June 2016.
  16. "Bucharest Tower Center International" (in Romanian). avrig35.ro. Retrieved 25 June 2016.
  17. 1 2 3 4 5 6 7 "Cum se vede Bucureştiul din cel mai înalt bloc de locuinţe" (in Romanian). economica.net. Retrieved 25 June 2016.
  18. "InterContinental Bucureşti – cel mai bun hotel de afaceri din România" (in Romanian). romanialibera.ro. Retrieved 25 June 2016.
  19. "Casa Poporului, cea mai grea clădire din lume" (in Romanian). dcnews.ro. Retrieved 25 June 2016.
  20. "Euro Tower, prima cladire de birouri cu certificat verde din Romania" (in Romanian). imobiliare.net. Retrieved 25 June 2016.
  21. "Oracle a închiriat 40% din Nusco Tower şi îşi consolidează "cartierul general" din zona Floreasca" (in Romanian). zf.ro. Retrieved 25 June 2016.
  22. 1 2 3 4 5 "Doamna Ghica Plaza Romfelt" (in Romanian). editstructural.ro. Retrieved 25 June 2016.
  23. 1 2 "Monaco Towers" (in Romanian). monacotowers.ro. Retrieved 25 June 2016.
  24. "Sentinta definitiva in cazul Cathedral Plaza: cladirea trebuie demolata. Ce spune Biserica Catolica despre primarul Oprescu" (in Romanian). stirileprotv.ro. Retrieved 25 June 2016.
  25. "Televiziunea Romana". emporis.com. Retrieved 2016-06-25.
  26. 1 2 "City Gate office development" (in Romanian). bluehousecapital.com. Retrieved 25 June 2016.
  27. "ING Bank a plecat din Kiseleff şi a ocupat Crystal Tower" (in Romanian). Ziarul financiar. Retrieved 2016-06-25.
  28. "Cum să revitalizezi o clădire de birouri. Studiu de caz: Millenium Business Center" (in Romanian). forbes.ro. Retrieved 25 June 2016.
  29. "Ansamblul de lux Alia Apartments a vândut 22 de apartamente în insolvenţă" (in Romanian). capital.ro. Retrieved 2016-06-25.
  30. "Care sunt cele mai inalte 10 cladiri din Bucuresti" (in Romanian). hotel-bucuresti.com. Retrieved 2016-06-25.
  31. "Bucharest HoJo becomes Sheraton hotel". business-review.eu. Retrieved 2016-06-25.
  32. "Blocul Sarbesc". emporis.com. Retrieved 2016-06-25.
  33. "Victoria Complex". emporis.com. Retrieved 2016-06-25.
  34. "Business Development Center Bucharest". emporis.com. Retrieved 2016-06-25.
  35. "UniCredit Tiriac Bank". emporis.com. Retrieved 2016-06-25.
  36. "InCity Residences 1". emporis.com. Retrieved 2016-06-25.
  37. "InCity Residences 2". emporis.com. Retrieved 2016-06-25.
  38. "InCity Residences 3". emporis.com. Retrieved 2016-06-25.
  39. "InCity Residences 4". emporis.com. Retrieved 2016-06-25.
  40. "InCity Residences lansează spre vânzare un nou bloc de apartamente" (in Romanian). bursa.ro. Retrieved 2016-06-25.
  41. "PGV Tower". emporis.com. Retrieved 2016-06-25.
  42. "Cel mai mare hotel din Europa, la Bucureşti" (in Romanian). gandul.info. Retrieved 2016-06-25.
  43. "B.O.S Bucharest Office Solutions". emporis.com. Retrieved 2016-06-25.
  44. "Piraeus Bank in Bucharest - Romania". terna.gr. Retrieved 2016-06-24.
  45. "PREMIUMRED prezinta PREMIUM PLAZA la Bucuresti" (in Romanian). comunicatemedia.ro. Retrieved 2016-06-25.
  46. "Sema Parc Building Two". emporis.com. Retrieved 2016-06-25.
  47. "Iuliu Maniu at Virtuţii Block". emporis.com. Retrieved 2016-06-25.
  48. "Vitan Platinum Towers". emporis.com. Retrieved 2016-06-25.
  49. "Pantelimon at Şoseaua Iancului Block". emporis.com. Retrieved 2016-06-25.
  50. "Griro Tower". emporis.com. Retrieved 2016-06-25.
  51. "Proiect: Primele birouri din Sema Parc, inchiriate". Ziarul Financiar (in Romanian). Retrieved 2009-08-17.
  52. "S Immo anunță o nouă dată de începere a construcției proiectului de birouri The Mark din București". rofit.ro (in Romanian). Retrieved 2016-06-29.
  53. "Una dintre cele mai impunatoare cladiri din Bucuresti va fi turnul din cadrul Sema New Project" (in Romanian). semanewproject.ro. Retrieved 2016-06-25.
  54. "Masterplanul intregii dezvoltari Sema New Project" (in Romanian). semanewproject.ro. Retrieved 2016-06-25.
  55. "Faza I de dezvoltare din cadrul Sema New Project" (in Romanian). semanewproject.ro. Retrieved 2016-06-25.
  56. "Prezentare generala Sema New Project" (in Romanian). semanewproject.ro. Retrieved 2016-06-25.
  57. "Faza II de dezvoltare" (in Romanian). semanewproject.ro. Retrieved 2016-06-25.
  58. "Dorobanti Tower Diamant, noul zgarie-nori de 200 de metri din Bucuresti" (in Romanian). banknews.ro. Retrieved 2009-08-13.
  59. "Tron Tower". lausterradu.com. Retrieved 2009-08-05.
  60. "Kiseleff Business Plaza". raduarchitects.com. Retrieved 2009-08-05.
  61. "Olympic Tower Bucharest". weichinger.de. Retrieved 2009-08-05.
  62. "Politehnica Office Tower". arhi-grup.ro. Retrieved 2009-08-05.
  63. "Carol Tower" (in Romanian). anuala.ro. Retrieved 2009-08-06.
  64. "Pitar Mos (CUPROM)". epsteinglobal.com. Retrieved 2009-08-06.
  65. "Prime Towers" (in Portuguese). estia.pt. Retrieved 2009-08-06.
  66. "Turnul Coltei - la trei veacuri de la inaltarea sa". Cronica Romana (in Romanian). 2004-02-07. Retrieved 2009-08-13.
  67. "Ultimul Foişor de Foc al Bucureştiului" (in Romanian). cimec.ro. 2005-03-07. Archived from the original on March 7, 2009. Retrieved 2009-08-07.
  68. "Millenium Business Center". Emporis.com. Retrieved 2009-08-05.
  69. "Project". Raiffeisen evolution. Retrieved 2012-08-17.
  70. "Calamităţi naturale - cutremurul din 1802" (in Romanian). Radio Romania International. 2009-05-11. Retrieved 2009-08-17.
  71. "Locul saptamanii: Foisorul de Foc (Muzeul Pompierilor)" (in Romanian). metropotam.ro. 2008-02-18. Retrieved 2009-08-17.
  72. "Tragedia de la blocul "Carlton"". Romania Libera (in Romanian). 2006-11-10. Retrieved 2009-08-17.

External links

This article is issued from Wikipedia - version of the 9/12/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.