Lane Cove Tunnel

Lane Cove Tunnel
Overview
Location Lane Cove, New South Wales
Status Open
Route M2
Start

Hills Motorway, North Ryde, Sydney

Epping Road
End Gore Hill Freeway, Artarmon, Sydney
Operation
Work begun June 2004
Opened 25 March 2007
Owner Transurban
Operator Transurban Ltd ASX: tcl
Traffic 40% Traffic
Toll $3.13 (passenger vehicles), $6.96 (heavy vehicles)
Technical
Length 3.6 km (2.2 mi)
Number of lanes 4
Operating speed 80km/h (variable)
Tunnel clearance 4.4 meters
Width 15 meters
Inside the Lane Cove Tunnel
Westbound entrance and eastbound exit in Artarmon
Travelling eastbound through the tunnel and its approach from Epping Road

The Lane Cove Tunnel is a A$1.1 billion, 3.6 km twin-tunnel tollway in Sydney, Australia, which connects the M2 Motorway at North Ryde with the Gore Hill Freeway at Artarmon. It is owned by toll road operator Transurban and forms part of the M2 and the 110 km Sydney Orbital Network.

In 2016 tolls for the Lane Cove Tunnel were $3.17 for passenger vehicles and $8.11 for heavy vehicles, and are adjusted in line with movements in the consumer price index.[1]

History

Connector Motorways, which was the owner and manager of the tunnel, as well as the associated Falcon Street Gateway, awarded a $1.1 billion contract to design and construct the tunnel to a joint venture between Thiess and the John Holland Group. It was intended to replace the few kilometres motorists had to drive along Epping Road, through the suburb of Lane Cove, between two sections of freeway.

During construction, in the early hours of 2 November 2005, the roof of a ventilation tunnel for the project collapsed. The collapse caused a 10 by 10 metre crater to appear near the southbound exit ramp of the Pacific Highway.[2] It also damaged a three-storey building at 11–13 Longueville Road, forcing the evacuation of 47 people.[3] Emergency crews pumped 1000 cubic metres of concrete into the hole to try to stop the housing block from collapsing into it.[4] An investigation by Workcover NSW found that the collapse was caused by geological conditions at the site, the large span width of the tunnel, and inadequacy of roof support. The proximity of the excavations to the surface resulted in the property damage.[2]

The tunnel was opened on 25 March 2007, two months ahead of schedule, by four workers who represented the 9,000 who had worked on the Lane Cove Tunnel, the Military Road E-Ramp and the widened Gore Hill Freeway Project. Following the opening there was a one-month toll-free period (as occurred with the Westlink M7).

Connector Motorways was supposed to operate the tunnel concession until 2037. However, the project was a disaster for the company, which went into receivership in January 2010 after a string of losses.[5]

International toll road operator Transurban bought the tunnel in May 2010 for $630 million and became the new operator.[6]

Alternative routes

Before the opening of the tunnel, motorists had to drive along Epping Road through the suburb of Lane Cove, for the few kilometres between two freeway sections. Studies by the tunnel operator indicated that the Lane Cove Tunnel would cut road travel times by up to 17 minutes and save motorists over $4 a trip.[7]

After the completion of the consequential surface road changes in March 2008, the existing Epping Road was slated to have 24-hour bus lanes to reduce travel times for east and west bound bus services, a new bus interchange, a shared cyclist and pedestrian path, and other measures were implemented to improve public transport and local traffic in the corridor.[8] Changes to the road network in the area had the primary aim of encourage traffic to use the new tolled tunnel instead of the untolled surface road.

Interchanges

LGALocationkmmiDestinationsNotes
RydeNorth Ryde00.0 M2 Hills Motorway / Epping Road  Epping, WindsorWestern end
WilloughbyArtarmon3.62.2 Gore Hill Freeway (M1) / Pacific Highway (A1) Sydney, Sydney AirportEastern end
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Controversy

Air quality

A report by CSIRO Deputy Chief of Air Science, Dr Peter Manins, concluded the ambient air quality modelling undertaken for Lane Cove Tunnel was 'best practice'.[9] The air quality modelling indicated that the Lane Cove Tunnel would comfortably meet the air quality requirements set by the Planning Minister's Conditions of Approval. Dr Manins also said most of the air quality modelling results were in fact likely to "over estimate emission and pollution levels".[10]

Ambient air quality is monitored at four monitoring stations nearby the tunnel's ventilation stacks. The monitoring results are published in real time on the operator's website.

The air quality readings published for particulate matter (PM10) are 24-hour averages, as required by the Planning Minister's Conditions of Approval for the tunnel. Some commentators are concerned that averaging the readings over 24 hours disguises the fact that the 50uG goal may be exceeded during peak periods, with low readings, which typically occur after midnight, effectively counteracting short-term breaches which occur during peak periods.

2007 State election

The Labor government was accused of interfering in the tunnel project to increase its re-election chances in the March 2007 election. The tunnel's expected late-2006 opening was pushed back to "January or February", closer to the poll date.[11] In fact, that deadline was missed and the opening was announced to be 25 March, the day after the election.

In December 2006, it was announced that surface road changes would be delayed by five months, meaning that they would not be completed until after state and federal elections. The delay, which was likely to cut into tunnel revenues, was agreed to by the operators at a cost to taxpayers of $25 million.[12][13]

The Sydney Morning Herald described the payment as a "bribe" and a "political rort". According to a Herald editorial, "The use of public funds to compensate Connector Motorways for delays to road changes around the tunnel is ... as cynical a piece of political jobbery as Sydney has seen in many a long year."[14]

Changes to Epping Road [15]

Changes made to Epping Road and associated roads included:[15]

Some parts of Epping Road [15] and Longueville Road required widening to provide the dedicated bus lanes and cycle path.

Epping Road eastbound,[19] between Mowbray Road west and Longueville Road,[19] Lane Cove, has one general traffic lane and one bus lane eastbound.

Epping Road westbound, between Longueville Road and Centennial Avenue, and between Sam Johnson Way and Mowbray Road West,[20] has two general traffic lanes and one bus lane. Between Centennial Avenue and Sam Johnson Way it has one general traffic lane and one bus lane.

Right turn lanes were reinstated for westbound traffic at the intersection of Parklands Avenue and Centennial Avenue, Lane Cove. Street lighting was upgraded. As the final construction activity, Epping Road between Mowbray Road and Pacific Highway was resurfaced with new asphalt and new line marking.

These changes were considered in the 2001 Environmental Impact Statement (EIS) and are part of the Planning Minister's 2003 approval.[21] They have been supported by a more recent Parliamentary Inquiry.[22]

The measures were designed to try to overcome the disconnection of the local community resulting from the extensive road work – reinstating right hand lanes, adding pedestrian crossings and making improvements to public transport infrastructure. Extensive community consultation [22] was undertaken.

See also

References

  1. "Lane Cove Tunnel". www.roamexpress.com.au. Retrieved 2016-01-20.
  2. 1 2 "Lane Cove Tunnel Construction Site Investigation: Report" (PDF). www.workcover.nsw.gov.au. 27 March 2006. Archived from the original (PDF) on 19 October 2007. Retrieved 2008-05-06.
  3. "Lane Cove Tunnel Project". www.lanecove.nsw.gov.au. Archived from the original on 18 May 2009. Retrieved 2008-05-06.
  4. "Commuter chaos to go on after tunnel collapse – National – smh.com.au". smh.com.au. 2 November 2005. Retrieved 2008-05-06.
  5. O'sullivan, Matt (20 January 2010). "Lane Cove Tunnel operator hits the wall". The Sydney Morning Herald.
  6. Lane Cove Tunnel sold for $630 million - ABC News (Australian Broadcasting Corporation). Abc.net.au (2010-05-10). Retrieved on 2013-09-07.
  7. Connector Motorways – Connector Motorways Home Page Archived 31 August 2007 at the Wayback Machine.
  8. (PDF) https://web.archive.org/web/20070831153238/http://www.connectormotorways.com.au/files/Info_Sheet__Epping_Road.pdf. Archived from the original (PDF) on 31 August 2007. Retrieved 30 August 2007. Missing or empty |title= (help)
  9. Connector Motorways – Connector Motorways Home Page
  10. Dr Peter Manins: examining our Living Atmosphere (Resume) Archived 8 August 2007 at the Wayback Machine.
  11. "Tunnel launch branded as an opportunistic election ploy". Sun-Herald. 17 December 2006. Retrieved 2007-01-28.
  12. "Iemma's $25m election bribe". The Sydney Morning Herald. 8 December 2006. Retrieved 2007-01-28.
  13. "Government pays tunnel operator $25m". News.com.au. 8 December 2006. Retrieved 2007-01-28.
  14. "Public money down the tunnel". Editorial. The Sydney Morning Herald. 11 December 2006. Retrieved 2007-01-28.
  15. 1 2 3 https://web.archive.org/web/20071113001029/http://www.connectormotorways.com.au/index.cfm?s=CAA6633E-3048-1075-63AF7C78202708AB. Archived from the original on 13 November 2007. Retrieved 1 October 2007. Missing or empty |title= (help)
  16. Longueville Road Pedestrian Bridge. YouTube (2007-07-18). Retrieved on 2013-09-07.
  17. Bike North News Archived 29 August 2007 at the Wayback Machine.. Bikenorth.org.au. Retrieved on 2013-09-07.
  18. Archived 19 July 2008 at the Wayback Machine.
  19. 1 2 Archived 13 November 2007 at the Wayback Machine.
  20. Home - Road Projects - Roads and Maritime Services Archived 1 October 2007 at the Wayback Machine.. Rta.nsw.gov.au. Retrieved on 2013-09-07.
  21. Home - Road Projects - Roads and Maritime Services Archived 4 September 2007 at the Wayback Machine.. Rta.nsw.gov.au. Retrieved on 2013-09-07.
  22. 1 2 "Archived copy" (PDF). Archived from the original (PDF) on 24 May 2011. Retrieved 2007-12-18.