Hudson Generating Station

Hudson Generating Station

Aerial view of the Hudson Generating Station with coal-delivery barges in the foreground
Location of Hudson Generating Station in Hudson County, New Jersey
Location Jersey City, New Jersey
Coordinates 40°44′50″N 74°04′21″W / 40.74722°N 74.07250°W / 40.74722; -74.07250Coordinates: 40°44′50″N 74°04′21″W / 40.74722°N 74.07250°W / 40.74722; -74.07250
Status active
Commission date Unit 1: 12/10/1964[1]
Unit 2: 12/18/1968[1]
Unit 3: 12/01/1967[1]
Decommission date Unit 1:12/08/2011[2]
Unit 3: 10/17/2003[2]
Owner(s) PSEG Fossil LLC
Thermal power station
Primary fuel low-sulphur bituminous coal from West Virginia, natural gas
Type Steam
Cooling source Hackensack River
Power generation
Nameplate capacity 660 MWe

Hudson Generating Station is a power plant which is owned and operated by PSEG Fossil LLC (PSEG), located in Jersey City in Hudson County, New Jersey, United States. The site has been in operation since 1906, but as of 2011 only one unit is currently in operation at the facility - Unit 2, which runs primarily on coal to generate electricity and is also capable of burning natural gas as a secondary fuel.[3] Unit 2 is also equipped with several back-end technology emission controls.

Location

The Hudson Generating Station occupies a 250-acre (100 ha) site north of the intersection of Duffield and Van Keuren Avenues. Located on the east bank of the Hackensack River near the Riverbend, three miles (5 km) upstream from Newark Bay, it creates the perimeter of Croxton and the Marion Section, and borders Secaucus at Penhorn Creek.

History

The Hudson Generating Station was built on the site of the former Marion Generating Station, the first PSEG plant, which started operation in 1906. The Marion Station was the largest in the PSEG fleet until 1924. The bulk of the Marion station was retired in 1961, as construction on the Hudson Station began. Unit 1 was installed in 1964 and retired in 2011. Unit 2 was installed in 1968 and acts as a load following unit.[4] Unit 3, a gas-burning turbine, was installed in 1967 and shut down in 2003. The Hudson Generating Station will be retired June 1, 2017 due to stricter environmental regulations.[5]

Fuel supply

Unit 2 typically burns a low-sulphur coal from West Virginia. In May 1996, a test on that coal indicated a 0.056 ppm (by weight) mercury content.[6] -According to the PSE&G annual report Coal for this plant comes from Indonesia -According to PSE&G's website: total plant capacity is 620Mwe

Water usage: There are no cooling towers at the PSE&G Hudson plant so Hackensack River water is utilized for the Plant's Rankine cycle condenser cooling. Since this plant is a very efficient fossil fuel plant, having a plant efficiency on the order of 41% -river water temperature rise is much, much less than that of an equally sized Nuclear power plant.

Historic Emissions

Annual NOx, SO2 and CO2 emissions[7]
Year NOx (short tons) SO2 (short tons) CO2 (short tons)
20091,889.21,455.71,870,629.5
20102,206.71,727.52,387,413.6
2011768.7987.31,967,294.7
2012372.8138.9663,637.3
2013478.2133.2771,667.4

Habitats and Environment

Ospreys

In 1997 PSEG Fossil officials discovered failed attempts by ospreys to build nests on a transmission tower at the Hudson Generating Station. To encourage ospreys to roost along the Hackensack River, Public Service Electric and Gas Co. erected a nesting platform atop a utility pole at the Hudson Generating Station the following year. The platform was built by students from the Hudson Liberty Council's Boy Scouts of America and the Urban League of Hudson County's youth build program.[8] However, the first osprey chick to hatch in the New Jersey Meadowlands since the early 20th century took to the air only on July 13, 2007, from its nest located at PSEG's Hudson Generating Station.[9]

NJDEP Environmental Stewardship Program

As of 2010, the station has achieved recognition by the New Jersey Department of Environmental Protection Compliance & Enforcement division in 10 of a possible 21 Environmental Stewardship categories.[10]

Conflicts and controversies

Clean Air Act Settlement and installation of Back End Technology

After being accused of violating New Source Review standards in 2000, PSEG settled with federal regulators and entered into a consent decree in 2002, which mandated the installation of emission controls at Hudson. In 2010, the facility completed installation of back-end technology to control emissions at the station: selective catalytic reduction to control nitrogen oxides, dry scrubbers to control sulfur dioxide, activated carbon injection to control mercury, and a pulse jet fabric filter system to control particulate emissions. Despite the $700 million USD investment in improvements in the facility some activists still consider it a detriment to the community.[11]

References

See also

This article is issued from Wikipedia - version of the 10/5/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.