Hosena station

Hosena
Deutsche Bahn S
Junction station

Hosena station, platforms
Location Hosena, Brandenburg
Germany
Coordinates 51°27′18″N 14°01′30″E / 51.455°N 14.025°E / 51.455; 14.025Coordinates: 51°27′18″N 14°01′30″E / 51.455°N 14.025°E / 51.455; 14.025
Line(s)
Platforms 4
Other information
Station code 2834 [1]
DS100 codeBHC [2]
Category5 [1]
History
Opened 1874
Services
Preceding station   DB Regio   Following station
Lauta
toward Hoyerswerda
RE 15
toward Dresden Hbf
Preceding station   S-Bahn Mitteldeutschland   Following station
Lauta
toward Hoyerswerda
S 4
toward Wurzen

Hosena station (Hohenbocka station until 2000) is a station at the junction of the Węgliniec–Roßlau railway and the Lübbenau–Kamenz railway. The station is located in the southeast of the German state of Brandenburg in the village of Hosena, north of the village of Hohenbocka.

Hosena station, the piers of the former elevated railway bridge towards Kamenz can be seen in the background

The station was built in 1873 as a “tower station” (German: Turmbahnhof, a two level interchange station) on the Lübbenau-Kamenz and Węgliniec (then called Kohlfurt)–Roßlau railways. Remains of the railway bridge of the Lübbenau-Kamenz line still exist.[3]

History

Historic map of Hosena rail transport hub
Remains of the old
Hosena station building

At the beginning of April 1871, King William I and the Kingdom of Saxony signed a concession for the establishment of the Berlin-Görlitz Railway Company (Berlin-Görlitzer Eisenbahn-Gesellschaft), with the concession giving permission for the construction of a railway connecting Senftenberg to the Kamenz–Pirna railway. The first construction work began on 1 September 1871. A treaty was contracted between Saxony and Prussia on 7 December 1871, which regulated the carrying out of construction on the Lübbenau–CalauSenftenberg–Kamenz route. The flat country north of Kamenz, which had few rivers, was favourable for rapid progress and the works proceeded without difficulty. The Prussian border was reached north of Hosena in 1872.

A connecting line of the Cottbus-Großenhain Railway Company running east-west, the later Lower Silesian mainline, was put into operation on 1 June 1874 between Kohlfurt and nearby Ruhland.

The Hosena railway junction became increasingly important at the beginning of the 20th century and in the 1940s. The resurgent lignite and basalt mining in the area led to an ever increasing volume of traffic. With the founding of the German Democratic Republic (GDR), the population in the area doubled on average. It is about 15 kilometres away from Hoyerswerda, which had about 70,000 inhabitants. Population growth, more intense mining operations and the establishment of industry in the Hosena area increased the importance of the station.

A 7.5 km section of the Lübbenau-Kamenz railway line was built between Senftenberg and Hohenbocka (or Hosena) between 1955 and 1957 to avoid an expansion of the Niemtsch (now called Senftenberger See—"Lake Senftenberg") open cast mine, which had been developed in the late 1930s. The new line was built from Hosena to the northwest through the village of Peickwitz and Biehlen and northeast to Brieske, where it connects with the Großenhain–Cottbus railway at the former halt of Brieske. The old line was dismantled north of Hosena and its remains at Hosenaer station is now used as a marshalling yard for the nearby basalt quarry in Koschenberg.

1990–2000

With the end of the GDR and the onset of economic and political change, the rapid development of the station came to a halt. The decline in population growth led to cuts and changes in traffic flows. On 23 May 1998, the passenger rail services on the Hosena–Kamenz section, which are the responsibly of the Verkehrsverbund Oberelbe (Upper Elbe Transport Association), were abandoned.

Since 2000

More closures and changes followed. Passenger rail services on the Hosena–Senftenberg section were abandoned on 10 October 2005. Nevetheless, in later years the Regional-Express service between Stralsund and Hoyerswerda and the Regionalbahn between Berlin-Schöneweide and Hoyerswerda route resumed. As a result of several construction projects in the area of the Verkehrsverbund Berlin-Brandenburg (Berlin-Brandenburg Transport Association), there was again a temporary suspension of the passenger service between Hosena and Senftenberg at the timetable change in December 2011.

Rail services

In the 2016 timetable the following services stop at Hosena station:

Line Route Frequency (min) Operator
RE 15 HoyerswerdaHosenaRuhlandGroßenhain Cottb BfDresden 120 DB Regio Nordost[4]

S 4

Hoyerswerda – Hosena – Ruhland – Falkenberg (Elster)EilenburgLeipzigLeipzig-Stötteritz – Wurzen 120 DB Regio Südost

At the timetable change on 15 December 2013, the previous RE 11 service was integrated in the network of the Mitteldeutschland S-Bahn as line S 4.

Notes

  1. 1 2 "Stationspreisliste 2016" [Station price list 2016] (PDF) (in German). DB Station&Service. 1 December 2015. Retrieved 24 January 2016.
  2. Eisenbahnatlas Deutschland (German railway atlas) (2009/2010 ed.). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  3. Historical photograph from 1914: Hohenbocka (Hosena) station – station building with the elevated bridge Lübbenau–Kamenz line in the background.
  4. "DB Regio Nordost betreibt das Netz Elbe-Elster" (in German). Deutsche Bahn AG. Retrieved 4 November 2014.

References

This article is issued from Wikipedia - version of the 1/19/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.