Great Grimsby and Sheffield Junction Railway

Great Grimsby and Sheffield Junction Railway
Dates of operation 18451847
Predecessor Grimsby Docks Company
Successor Manchester, Sheffield and Lincolnshire Railway
Track gauge 4 ft 8 12 in (1,435 mm)
Headquarters Grimsby, England

GG&SJR
New Holland to Grimsby Line

Legend
New Holland Pier
New Holland Town
Barton Line
to Barton
New Holland
Goxhill

Barton & Immingham Lt Rly
to Immingham Dock
Thornton Abbey
Thornton Curtis

Barton & Immingham Lt Rly
to Immingham Dock
Ulceby
Sheffield to Lincoln Line
to Barnetby
Habrough
Stallingborough
Healing
Great Coates
West Marsh Junction
Grimsby District Lt Rly
Grimsby Town
East Lincolnshire Railway
to Louth and Boston
Barton Line
to Cleethorpes

The Great Grimsby and Sheffield Junction Railway was an early British railway company which existed between 1845 and 1847 with the intention of providing rail services between Grimsby, New Holland and Gainsborough in the county of Lincolnshire. It amalgamated with the Sheffield, Ashton-Under-Lyne and Manchester Railway and the Sheffield and Lincolnshire Junction Railway, the three being renamed the Manchester, Sheffield and Lincolnshire Railway in 1847.

History

The company

As a company, it was the oldest of the three, having begun in 1796 as the Grimsby Haven Company, when the harbour was enlarged. When new fishing grounds were discovered on the Dogger Bank trade increased and in 1845 the Grimsby Haven became part of the Grimsby Docks Company. Five of its directors were also on the board of the proposed Great Grimsby & Sheffield Junction Railway, intended to connect with the proposed Sheffield and Lincolnshire line. The decision was taken to amalgamate the two undertakings.

Both the SA&MR and the S&LJR were well represented on the board and it was the latter's engineer who had carried out the survey in 1844. He offered three alternatives, via Brigg, via Caistor or via Market Rasen. Of the three, the first was chosen, with a branch from Brigg to Market Rasen. The line received the Royal Assent at the same time as the Grimsby Docks Company was approved in 1845.[1] The ferries on the Humber were also purchased and a branch would be built to New Holland. In 1846 permission was gained for line from Market Rasen to Lincoln.

Lines and stations

The first board meeting of the amalgamated Manchester, Sheffield and Lincolnshire Railway took place on 6 January 1847. Work concentrated on the section between Grimsby and New Holland Pier, which opened on 1 March 1848 concurrently the East Lincolnshire Railway from Grimsby to Louth (now part of the Great Northern). There were stations at Goxhill, Ulceby, Habrough, Stallingborough, Healing and Great Coates. The station at Thornton Abbey was built in 1849 replacing one at Thornton Curtis. The line from Ulceby to Brigg opened a few months later, followed by that to Market Rasen and thence to Lincoln. The first included stations at Brocklesby and Barnetby. The latter had stations at Moortown, Holton Le Moor, Usselby, Wickenby, Langworth and Reepham. The section between Brigg and Gainsborough opened in 1849, with stations at Scawby and Hibaldstow, Kirton Lindsey, Northorpe and Blyton.

Officers

See also

References

  1. "Hansard, 06 June 1845 - Great Grimsby and Sheffield Junction Railway Bill". Retrieved 18 March 2009.
  2. Dow, George (2004). Great Central. Volume The Progenitors, 1813-1863. Ian Allan Ltd. ISBN 071101468X.
This article is issued from Wikipedia - version of the 8/6/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.