Ashbourne Line

Ashbourne Line

Legend
LNWR line
to Manchester
Midland Railway
line to Manchester

Millers Dale
Buxton

Former line to Matlock
(now Peak Rail)
LNWR | Midland
Higher Buxton
Cromford and High Peak Railway
Hindlow
Hindlow Tunnel
Hindlow Quarry
Dowlow Halt
Dowlow Works
Hurdlow
Parsley Hay
Cromford and High Peak Railway
Hartington
Alsop en le Dale
Tissington
Thorpe Cloud
Ashbourne
Clifton (Mayfield)
Norbury and Ellaston
North Staffordshire Railway
Rocester
Uttoxeter
Crewe to Derby Line

The Ashbourne Line was a 33 12 mi (53.9 km)[1] railway from Buxton via Ashbourne to Uttoxeter. It was built by the London and North Western Railway using a section of the Cromford and High Peak Railway (C&HPR) and it joined the North Staffordshire Railway at Ashbourne, proceeding to Uttoxeter with a junction onto the main line at Rocester.

Origins

Although the country between Buxton and Ashbourne was sparsely populated, and the terrain immensely difficult, there were a number of motivations for its construction. Ashbourne was one of the few large settlements in the area without a railway connection until the North Staffordshire Railway built its branch from the Churnet Valley line in 1852. Meanwhile, a lucrative trade in limestone was building up and the LNWR's only route southwards was through the Manchester area. Finally, and not least, the Midland Railway was threatening to take over the Derbyshire business through its attempts to reach Manchester from Derby via Buxton.

The LNWR sought to consolidate its position by building a line southwards across the Midland's path. Both railways had arrived at Buxton almost simultaneously in 1863, with termini adjacent to each other (and Buxton lost its chance to be served by a mainline railway).

The LNWR had leased the Cromford and High Peak in 1861 and in 1874 it gained permission to link Buxton with the C&HPR, which it had leased in 1862, at Hindlow Junction just south of Harpur Hill, which it reached in 1892.[1] At the other end, it would build High Peak Junction near Cromford. After some delay, a further bill was sought in 1887 which, in addition, allowed the complete takeover of the High Peak line. Services began to Parsley Hay on 1 June 1894.[1]

Meanwhile, the North Staffordshire Railway had extended into Ashbourne from its Churnet Valley Line in 1852.

The 13 mi (21 km) section from Parsley Hay to Ashbourne was authorised by the LNWR Act of 4 August 1890, the building contract awarded to Naylor Brothers on 10 December 1895,[1] and it was opened on 4 August 1899.[1] A new Ashbourne station was built jointly by the NSR and the LNWR. The Station Hotel (known as The Beresford Arms for some time, but which has now reverted to its original name) dates from this time.

Route of the railway

Construction

Hogshaw Viaduct at Buxton - geograph.org.uk - 982042

Buxton station having been built as a terminus facing north it was first necessary to proceed around a tight 180 degree curve over the 15-arch Hogshaw Viaduct,[1] with a gradient as steep as 1 in 62, to the station at Higher Buxton. On leaving the town the line passed over 13-arch Dukes Drive Viaduct,[1] and then climbed steadily at 1 in 62 to Beswick's Sidings. The gradient eased from there to Hindlow, where the line joined the CHPR. It then climbed once more at 1 in 60, through the 514 yd (470 m) Hindlow Tunnel,[1] to the summit of the line at Dowlow, a height of 1,260 ft (380 m) above sea level, making it the highest public line in England at that time. This section still exists, serving various lime works at Hindlow and Dowlow.[2]

From there the line fell at 1 in 60 to Hurdlow (for Longnor and Monyash), but then the gradient eased considerably to Parsley Hay, where it left the CH&PR. From there to Ashbourne the line was single, with passing loops at all stations except Thorpe Cloud, and although the line was initially fairly level it included a number of tight curves. The next stop was Hartington, where after about a couple of miles the line began to fall steeply again at 1 in 60 through Alsop en le Dale, Tissington, Fenny Bentley, where there was a goods depot, and Thorpe Cloud, and finally through 378 yd (346 m) Church St tunnel[1] to Ashbourne.

It can be seen that the gradients and curves meant that it was always a difficult line to work, particularly during winter when it was exposed to the elements on the high moors. By contrast, the line from Ashbourne southwards was relatively easy, following river valleys as it did, first the Henmore Brook and then the River Dove.

History

There were regular trains from Ashbourne to Derby.

Baedeker for 1890 gives the following information: Railway from Ashbourne to Derby, 30 M., in 1¼-2 hours (fares 2s.6d., 2s., 1s. 3d.) - 5M Norbury with a highly interesting church (14-15cent; fine stained-glass) and an ancient manor house - At 7M Rocester( rail, refreshment rooms) the pretty 'Churnet Valley line' diverges to the right; the first station on it is (3½M) Alton - 11M Uttoxeter 19M Tutbury - 30M Derby[3]

Once the line to Parsley Hay was open in 1899, there were six trains a day between Buxton and Ashbourne, but the expected expresses were no more than through coaches being attached to London trains.[4] Until 1914 it was possible to travel the 168 12 mi (271.2 km) from Euston to Buxton in 4hr 24min.[1] Nevertheless, it was valuable for freight, not only minerals, but milk and other farm produce. Moreover, it became a lifeline during the winter snowstorms: two years after the line opened, a train of six-wheeled carriages became derailed by the snow and was marooned for three days, during which time the crew were given hot food and drinks by local farmers. This camaraderie ensured that the trains would always get through somehow.

Throughout its existence It served townsfolk who wished to explore the countryside, and country folk who wanted to visit town. Regular passenger services finished on 30 October 1954,[5] but specials and excursions of various kinds continued until 1963. in its last years the line was worked by a LMS Fowler 2-6-2T and 2 coaches.[1]

In the same year, freight traffic finished between Ashbourne and Hartington, to Rocester in 1964, from Hartington to Parsley Hay in October 1967, and to Hindlow the following month.

The route today

Although all trace of the old NSR lines has practically disappeared, the track bed from Ashbourne to Parsley Hay was acquired by Derbyshire County Council and the Peak National Park for a cycle and walking route. This, the Tissington Trail, was one of the first of such ventures in the country. Later, Ashbourne Tunnel was acquired by Sustrans.

The line is still open from Buxton to Hindlow for stone traffic from Buxton Lime Industries and Lafarge Dowlow.[2]

References

  1. 1 2 3 4 5 6 7 8 9 10 11 Railway Magazine October 1963 pp. 675-684 Peter E Baughan: Buxton Centenary
  2. 1 2 Jacobs, G., (Ed.) (2005) Railway Track Diagrams Book 4: Midlands and North West, Bradford-on-Avon: Trackmaps
  3. Baedeker's Great Britain 1890 (reprint Moretonhampstead: Old House Books)
  4. Anderson, P.H., (1985 2nd ed) Forgotten Railways Vol 2: The East Midlands, Newton Abbot: David and Charles
  5. The Ashbourne News and Dove Valley Record, 28 October and 4 November 1954. Available Derby Local Studies Library

External links

Bibliography

Coordinates: 53°04′50″N 1°45′12″W / 53.08044°N 1.75322°W / 53.08044; -1.75322

This article is issued from Wikipedia - version of the 10/19/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.